Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Apply Date:
06/13/2024
Applicant:
Desert Barricades LLC
Description:
WO 6261470 - TEP will be working in ROW to install new underground conduit tie, the installation of new conductor to serve the new substation project which includes (INSTALLATION OF 12 - 4" CONDUIT DUCT BANK APPROXIMATELY 300' WITH A NEW TYPE B PULL BOX(attached)).. Approved development plan for offsite improvements submitted DP22-0160/TR-PIA-1222-0005 and TCP is attached, no sidewalk impact.

Permit Reviews

Permit Number - TR-UTL-0624-01144
Permit Status: Complete
Permit Description: WO 6261470 - TEP will be working in ROW to install new underground conduit tie, the installation of new conductor to serve the new substation project which includes (INSTALLATION OF 12 - 4" CONDUIT DUCT BANK APPROXIMATELY 300' WITH A NEW TYPE B PULL BOX(attached)).. Approved development plan for offsite improvements submitted DP22-0160/TR-PIA-1222-0005 and TCP is attached, no sidewalk impact.
Start Date Submittal Complete Date Status  
06/13/2024 RIGHT-OF-WAY REVIEW v.1 06/18/2024 REQUIRES RESUBMIT Review Details
06/18/2024 RIGHT-OF-WAY REVIEW v.2 06/25/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0624-01144
Permit Status: Complete
Permit Description: WO 6261470 - TEP will be working in ROW to install new underground conduit tie, the installation of new conductor to serve the new substation project which includes (INSTALLATION OF 12 - 4" CONDUIT DUCT BANK APPROXIMATELY 300' WITH A NEW TYPE B PULL BOX(attached)).. Approved development plan for offsite improvements submitted DP22-0160/TR-PIA-1222-0005 and TCP is attached, no sidewalk impact.
Total Outstanding Activity Conditions - 3
Date Name
06/14/2024 Traffic control set-up approved between 9AM - 3:30PM
06/14/2024 Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual.
06/14/2024 PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0624-01144
Permit Description: WO 6261470 - TEP will be working in ROW to install new underground conduit tie, the installation of new conductor to serve the new substation project which includes (INSTALLATION OF 12 - 4" CONDUIT DUCT BANK APPROXIMATELY 300' WITH A NEW TYPE B PULL BOX(attached)).. Approved development plan for offsite improvements submitted DP22-0160/TR-PIA-1222-0005 and TCP is attached, no sidewalk impact.
Total Completed Inspections - 6