Permit: TR-UTL-0624-01144
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
2501 N FLOWING WELLS RD
Address NEW:
2501 N FLOWING WELLS RD
Apply Date:
06/13/2024
Applicant:
Desert Barricades LLC
Description:
WO 6261470 - TEP will be working in ROW to install new underground conduit tie, the installation of new conductor to serve the new substation project which includes (INSTALLATION OF 12 - 4" CONDUIT DUCT BANK APPROXIMATELY 300' WITH A NEW TYPE B PULL BOX(attached)).. Approved development plan for offsite improvements submitted DP22-0160/TR-PIA-1222-0005 and TCP is attached, no sidewalk impact.
Permit Reviews
Permit Number - TR-UTL-0624-01144
Permit Status: Complete
Permit Description: WO 6261470 - TEP will be working in ROW to install new underground conduit tie, the installation of new conductor to serve the new substation project which includes (INSTALLATION OF 12 - 4" CONDUIT DUCT BANK APPROXIMATELY 300' WITH A NEW TYPE B PULL BOX(attached)).. Approved development plan for offsite improvements submitted DP22-0160/TR-PIA-1222-0005 and TCP is attached, no sidewalk impact.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/13/2024 | RIGHT-OF-WAY REVIEW v.1 | 06/18/2024 | REQUIRES RESUBMIT |
| 06/18/2024 | RIGHT-OF-WAY REVIEW v.2 | 06/25/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0624-01144
Permit Status: Complete
Permit Description: WO 6261470 - TEP will be working in ROW to install new underground conduit tie, the installation of new conductor to serve the new substation project which includes (INSTALLATION OF 12 - 4" CONDUIT DUCT BANK APPROXIMATELY 300' WITH A NEW TYPE B PULL BOX(attached)).. Approved development plan for offsite improvements submitted DP22-0160/TR-PIA-1222-0005 and TCP is attached, no sidewalk impact.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 06/14/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 06/14/2024 | Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual. |
| 06/14/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0624-01144
Permit Description: WO 6261470 - TEP will be working in ROW to install new underground conduit tie, the installation of new conductor to serve the new substation project which includes (INSTALLATION OF 12 - 4" CONDUIT DUCT BANK APPROXIMATELY 300' WITH A NEW TYPE B PULL BOX(attached)).. Approved development plan for offsite improvements submitted DP22-0160/TR-PIA-1222-0005 and TCP is attached, no sidewalk impact.
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/09/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 09/30/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 09/30/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
| 09/30/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 09/30/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 09/30/2024 | TRSP - ROW - Final/Close-Out | Passed |