Permit: TR-UTL-0624-01126
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
921 N ANITA AV
Address NEW:
921 N ANITA AV
Apply Date:
06/07/2024
Applicant:
Quail Traffic
Description:
EXCAVATING A 10X3 TRENCH AT 921 N ANITA AVE TO REPLACE GAS SERVICE IN ROW IN ASPHALT AND DIRT. TRENCH WILL BE LOCATED APPROX 10' EAST OF EAST P/L AND 15' NORTH OF SOUTH P/L
Permit Reviews
Permit Number - TR-UTL-0624-01126
Permit Status: Complete
Permit Description: EXCAVATING A 10X3 TRENCH AT 921 N ANITA AVE TO REPLACE GAS SERVICE IN ROW IN ASPHALT AND DIRT. TRENCH WILL BE LOCATED APPROX 10' EAST OF EAST P/L AND 15' NORTH OF SOUTH P/L
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/07/2024 | RIGHT-OF-WAY REVIEW v.1 | 06/16/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0624-01126
Permit Status: Complete
Permit Description: EXCAVATING A 10X3 TRENCH AT 921 N ANITA AVE TO REPLACE GAS SERVICE IN ROW IN ASPHALT AND DIRT. TRENCH WILL BE LOCATED APPROX 10' EAST OF EAST P/L AND 15' NORTH OF SOUTH P/L
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 06/07/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 06/07/2024 | Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual. |
| 06/07/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0624-01126
Permit Description: EXCAVATING A 10X3 TRENCH AT 921 N ANITA AVE TO REPLACE GAS SERVICE IN ROW IN ASPHALT AND DIRT. TRENCH WILL BE LOCATED APPROX 10' EAST OF EAST P/L AND 15' NORTH OF SOUTH P/L
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/22/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 07/22/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
| 07/22/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 07/22/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 07/22/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 07/22/2024 | TRSP - ROW - Notice of Completion | Passed | ||
| 07/22/2024 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | ||
| 07/22/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed |