Permit: TR-UTL-0624-01113
Permit Details
Apply Date:
06/05/2024
Applicant:
Chelsey Bolinger
Description:
KAHNA P.067198D - BORE 4805' & TRENCH 107' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (56) CABINET, HANDHOLE, PEDESTAL, FLOWERPOT. ( Full Neighborhood Work Area Coverage) Permit update 10/18/2024: Renewed for 90 days.
Permit Reviews
Permit Number - TR-UTL-0624-01113
Permit Status: Complete
Permit Description: KAHNA P.067198D - BORE 4805' & TRENCH 107' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (56) CABINET, HANDHOLE, PEDESTAL, FLOWERPOT. ( Full Neighborhood Work Area Coverage)
Permit update 10/18/2024: Renewed for 90 days.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/05/2024 | RIGHT-OF-WAY REVIEW v.1 | 06/16/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0624-01113
Permit Status: Complete
Permit Description: KAHNA P.067198D - BORE 4805' & TRENCH 107' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (56) CABINET, HANDHOLE, PEDESTAL, FLOWERPOT. ( Full Neighborhood Work Area Coverage)
Permit update 10/18/2024: Renewed for 90 days.
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
06/05/2024 | Traffic Control set-up approved between 7AM - 5PM |
06/05/2024 | Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual. |
06/05/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0624-01113
Permite Description: KAHNA P.067198D - BORE 4805' & TRENCH 107' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (56) CABINET, HANDHOLE, PEDESTAL, FLOWERPOT. ( Full Neighborhood Work Area Coverage)
Permit update 10/18/2024: Renewed for 90 days.
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/20/2025 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | N/A | Not Applicable | no concrete restoration required |
01/20/2025 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | N/A | Not Applicable | no concrete restoration required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0624-01113
Permit Description: KAHNA P.067198D - BORE 4805' & TRENCH 107' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (56) CABINET, HANDHOLE, PEDESTAL, FLOWERPOT. ( Full Neighborhood Work Area Coverage)
Permit update 10/18/2024: Renewed for 90 days.
Total Completed Inspections - 7
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/10/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
10/29/2024 | TRSP - ROW - SITE INSPECTION | Passed | Job started today for Area D | |
01/20/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | Traffic control set up, not witnessed, all elements taken down | |
01/20/2025 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | asphalt restoration T top patches in place, completed | |
01/20/2025 | TRSP - ROW - Barricade Takedown | Passed | All traffic control elements from permit D area removed | |
01/20/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | all pedestal connection areas behind curb, backfilled and compacted with native soil to 85%, approved | |
01/20/2025 | TRSP - ROW - Final/Close-Out | Passed | all prior inspections passed, Traffic control removed, completed |