Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
3222 S CHAMPLAIN AV
Apply Date:
06/05/2024
Applicant:
Chelsey Bolinger
Description:
P.067196C (KAHNA) - BORE 771' & TRENCH 72’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FIBER SAI CABINET, (11) HANDHOLES & (3) PEDS. OVERLASH 3,706’ OF AERIAL FIBER CABLE. (Work Area ) From Pantano Rd to Manitoba Rd : Between Victoria Dr & Winnipeg Dr Pantano Rd to Victoria Ave : Between Victoria Dr & Nicaragua Dr Stella Dr to Alley North of Victoria Dr : Between Mead Ave & Champlain Ave *Renewal for 90 days as of 9/23/24*

Permit Reviews

Permit Number - TR-UTL-0624-01103
Permit Status: Complete
Permit Description: P.067196C (KAHNA) - BORE 771' & TRENCH 72’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FIBER SAI CABINET, (11) HANDHOLES & (3) PEDS. OVERLASH 3,706’ OF AERIAL FIBER CABLE. (Work Area ) From Pantano Rd to Manitoba Rd : Between Victoria Dr & Winnipeg Dr Pantano Rd to Victoria Ave : Between Victoria Dr & Nicaragua Dr Stella Dr to Alley North of Victoria Dr : Between Mead Ave & Champlain Ave *Renewal for 90 days as of 9/23/24*
Start Date Submittal Complete Date Status  
06/05/2024 RIGHT-OF-WAY REVIEW v.1 06/17/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0624-01103
Permit Status: Complete
Permit Description: P.067196C (KAHNA) - BORE 771' & TRENCH 72’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FIBER SAI CABINET, (11) HANDHOLES & (3) PEDS. OVERLASH 3,706’ OF AERIAL FIBER CABLE. (Work Area ) From Pantano Rd to Manitoba Rd : Between Victoria Dr & Winnipeg Dr Pantano Rd to Victoria Ave : Between Victoria Dr & Nicaragua Dr Stella Dr to Alley North of Victoria Dr : Between Mead Ave & Champlain Ave *Renewal for 90 days as of 9/23/24*
Total Outstanding Activity Conditions - 3
Date Name
06/06/2024 Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced.
06/06/2024 Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley.
06/06/2024 Traffic/Mobility Control Plan (MCP) approved as submitted.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0624-01103
Permit Description: P.067196C (KAHNA) - BORE 771' & TRENCH 72’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FIBER SAI CABINET, (11) HANDHOLES & (3) PEDS. OVERLASH 3,706’ OF AERIAL FIBER CABLE. (Work Area ) From Pantano Rd to Manitoba Rd : Between Victoria Dr & Winnipeg Dr Pantano Rd to Victoria Ave : Between Victoria Dr & Nicaragua Dr Stella Dr to Alley North of Victoria Dr : Between Mead Ave & Champlain Ave *Renewal for 90 days as of 9/23/24*
Total Completed Inspections - 5
Date Description Inspector Results Comments
09/10/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
12/23/2024 TRSP - ROW - Barricade - Setup/Routine Passed No barricade set up witnessed, all traffic control removed
12/23/2024 TRSP - ROW - Barricade Takedown Passed All traffic control barricades removed
12/23/2024 TRSP - ROW - Backfill - Placement/Compaction Passed all excavations in alleyways, native backfill, checked and approved
12/23/2024 TRSP - ROW - Final/Close-Out Passed All prior inspections passed, traffic control removed, permit C closed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
P.067196C - CITY OF TUCSON PLANS - 06-05-2024_V1.PDF DOCUMENTS VIEW
P.067196C - CITY OF TUCSON TCP - 06-05-2024_V1.PDF DOCUMENTS VIEW