Permit: TR-UTL-0624-01101
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
7939 E DREAM VIEW DR
Address NEW:
7939 E DREAM VIEW DR
Apply Date:
06/05/2024
Applicant:
Chelsey Bolinger
Description:
P.067196A (KAHNA) - BORE 3,441' & TRENCH 166’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FIBER SAI CABINET, (20) HANDHOLES & (5) PEDS. OVERLASH 461’ OF AERIAL FIBER CABLE. 09/25/2024 - Revised SOW BORE 2,266’ & TRENCH 198’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (29) FSAI CABINET, HANDHOLES & PEDESTALS. OVERLASH 519’ OF AERIAL FIBER CABLE.
Permit Reviews
Permit Number - TR-UTL-0624-01101
Permit Status: Complete
Permit Description: P.067196A (KAHNA) - BORE 3,441' & TRENCH 166’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FIBER SAI CABINET, (20) HANDHOLES & (5) PEDS. OVERLASH 461’ OF AERIAL FIBER CABLE.
09/25/2024 - Revised SOW
BORE 2,266’ & TRENCH 198’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (29) FSAI CABINET, HANDHOLES & PEDESTALS. OVERLASH 519’ OF AERIAL FIBER CABLE.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/18/2024 | RIGHT-OF-WAY REVIEW v.1 | 09/25/2024 | APPROVED |
| 07/25/2024 | RIGHT-OF-WAY REVIEW v.2 | 08/01/2024 | APPROVED |
| 06/05/2024 | RIGHT-OF-WAY REVIEW v.1 | 06/13/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0624-01101
Permit Status: Complete
Permit Description: P.067196A (KAHNA) - BORE 3,441' & TRENCH 166’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FIBER SAI CABINET, (20) HANDHOLES & (5) PEDS. OVERLASH 461’ OF AERIAL FIBER CABLE.
09/25/2024 - Revised SOW
BORE 2,266’ & TRENCH 198’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (29) FSAI CABINET, HANDHOLES & PEDESTALS. OVERLASH 519’ OF AERIAL FIBER CABLE.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 06/05/2024 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 06/05/2024 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 06/05/2024 | Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual. |
| 06/05/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
| 06/05/2024 | Traffic/Mobility Control Plan (MCP) approved with conditions. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0624-01101
Permite Description: P.067196A (KAHNA) - BORE 3,441' & TRENCH 166’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FIBER SAI CABINET, (20) HANDHOLES & (5) PEDS. OVERLASH 461’ OF AERIAL FIBER CABLE.
09/25/2024 - Revised SOW
BORE 2,266’ & TRENCH 198’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (29) FSAI CABINET, HANDHOLES & PEDESTALS. OVERLASH 519’ OF AERIAL FIBER CABLE.
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/06/2025 | TRSP - ROW - Paving - Subgrade/removal/placement | N/A | Not Applicable | No paving/asphalt restoration needed, all bore routes and pot holing done behind curb in landscape |
| 01/03/2025 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | N/A | Not Applicable | No hardscape impacted during work, restoration not required |
| 01/03/2025 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | N/A | Not Applicable | No hardscape impacted during work, restoration not required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0624-01101
Permit Description: P.067196A (KAHNA) - BORE 3,441' & TRENCH 166’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FIBER SAI CABINET, (20) HANDHOLES & (5) PEDS. OVERLASH 461’ OF AERIAL FIBER CABLE.
09/25/2024 - Revised SOW
BORE 2,266’ & TRENCH 198’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (29) FSAI CABINET, HANDHOLES & PEDESTALS. OVERLASH 519’ OF AERIAL FIBER CABLE.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/11/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 01/03/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | Barricade set up not witnessed, all traffic control removed | |
| 01/03/2025 | TRSP - ROW - Barricade Takedown | Passed | All barricades removed | |
| 01/06/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | all excavations done in landscape areas and backfilled with native soil to 85% compaction, approved | |
| 01/06/2025 | TRSP - ROW - Final/Close-Out | Passed | all prior inspections completed and passed, all traffic control removed, job complete |