Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-0623-01924
Permit Details
Apply Date:
06/30/2023
Applicant:
Jamal Brown
Description:
(1) 5' x 5' bell hole in asphalt with an approx. 2' x 30' trench in asphalt across E Mabel St, and an approx. 2' x 20' trench in dirt, cutting through sidewalk.
Permit Reviews
Permit Number - TR-UTL-0623-01924
Permit Status: Complete
Permit Description: (1) 5' x 5' bell hole in asphalt with an approx. 2' x 30' trench in asphalt across E Mabel St, and an approx. 2' x 20' trench in dirt, cutting through
sidewalk.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/30/2023 | RIGHT-OF-WAY REVIEW v.1 | 07/03/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0623-01924
Permit Status: Complete
Permit Description: (1) 5' x 5' bell hole in asphalt with an approx. 2' x 30' trench in asphalt across E Mabel St, and an approx. 2' x 20' trench in dirt, cutting through
sidewalk.
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
06/30/2023 | PRE ACTIVITY MEETING & ASPHALT REPAIRS |
06/30/2023 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0623-01924
Permite Description: (1) 5' x 5' bell hole in asphalt with an approx. 2' x 30' trench in asphalt across E Mabel St, and an approx. 2' x 20' trench in dirt, cutting through
sidewalk.
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/13/2023 | TRSP - ROW - Final/Close-Out | N/A | Re-inspection required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0623-01924
Permit Description: (1) 5' x 5' bell hole in asphalt with an approx. 2' x 30' trench in asphalt across E Mabel St, and an approx. 2' x 20' trench in dirt, cutting through
sidewalk.
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/17/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
06/12/2024 | TRSP - ROW - Final/Close-Out | Passed |