Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-0623-01916
Permit Details
Apply Date:
06/30/2023
Applicant:
Jaime Rivera
Description:
323xxx Site 2 - Remove and replace cleanout 9595*02 with a terminal manhole for CIPP installation. Install Approximately 100LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and manhole bench rehabilitation will be completed on MH's 9595-08 per PCRWRD standard detail 211
Permit Reviews
Permit Number - TR-UTL-0623-01916
Permit Status: Complete
Permit Description: 323xxx Site 2 - Remove and replace cleanout 9595*02 with a terminal manhole for CIPP installation. Install Approximately 100LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and manhole bench rehabilitation will be completed on MH's 9595-08 per PCRWRD standard detail 211
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/30/2023 | RIGHT-OF-WAY REVIEW v.1 | 07/03/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0623-01916
Permit Status: Complete
Permit Description: 323xxx Site 2 - Remove and replace cleanout 9595*02 with a terminal manhole for CIPP installation. Install Approximately 100LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and manhole bench rehabilitation will be completed on MH's 9595-08 per PCRWRD standard detail 211
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
06/30/2023 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0623-01916
Permite Description: 323xxx Site 2 - Remove and replace cleanout 9595*02 with a terminal manhole for CIPP installation. Install Approximately 100LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and manhole bench rehabilitation will be completed on MH's 9595-08 per PCRWRD standard detail 211
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/25/2023 | TRSP - ROW - Recurring | N/A | Complete (Recurring) |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0623-01916
Permit Description: 323xxx Site 2 - Remove and replace cleanout 9595*02 with a terminal manhole for CIPP installation. Install Approximately 100LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and manhole bench rehabilitation will be completed on MH's 9595-08 per PCRWRD standard detail 211
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/15/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
10/04/2023 | TRSP - ROW - Final/Close-Out | Passed |