Permit: TR-UTL-0623-01882
Permit Details
Apply Date:
06/26/2023
Applicant:
DOONE BAKER
Description:
(Previously approved permit# TR-UTL-0423-01258) P.067127 - KAHNA Boring - 730' Trenching - 91' Aerial - 3,609' Boring and/or Trenching to place new CTL Cabinet, plus other buried sections. Along with Aerial Over-Lash and Placement.
Permit Reviews
Permit Number - TR-UTL-0623-01882
Permit Status: Complete
Permit Description: (Previously approved permit# TR-UTL-0423-01258) P.067127 - KAHNA
Boring - 730' Trenching - 91' Aerial - 3,609' Boring and/or Trenching to place new CTL Cabinet, plus other buried sections. Along with Aerial Over-Lash and Placement.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/27/2023 | RIGHT-OF-WAY REVIEW v.1 | 07/07/2023 | APPROVED |
Conditions
Permit Number - TR-UTL-0623-01882
Permit Status: Complete
Permit Description: (Previously approved permit# TR-UTL-0423-01258) P.067127 - KAHNA
Boring - 730' Trenching - 91' Aerial - 3,609' Boring and/or Trenching to place new CTL Cabinet, plus other buried sections. Along with Aerial Over-Lash and Placement.
Date | Description | Comments |
---|---|---|
06/27/2023 | * PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. | |
06/27/2023 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0623-01882
Permit Description: (Previously approved permit# TR-UTL-0423-01258) P.067127 - KAHNA
Boring - 730' Trenching - 91' Aerial - 3,609' Boring and/or Trenching to place new CTL Cabinet, plus other buried sections. Along with Aerial Over-Lash and Placement.
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/08/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
10/09/2023 | TRSP - ROW - Final/Close-Out | Passed | ||
10/09/2023 | TRSP - ROW - Recurring | Passed |