Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-0623-01847
Permit Details
Apply Date:
06/22/2023
Applicant:
Bobby Robbins
Description:
1 5X5 BELLHOLE ON CONCRETE/ASPHALT TO REPLACE GAS LINE
Permit Reviews
Permit Number - TR-UTL-0623-01847
Permit Status: Complete
Permit Description: 1 5X5 BELLHOLE ON CONCRETE/ASPHALT TO REPLACE GAS LINE
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/22/2023 | RIGHT-OF-WAY REVIEW v.1 | 06/22/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0623-01847
Permit Status: Complete
Permit Description: 1 5X5 BELLHOLE ON CONCRETE/ASPHALT TO REPLACE GAS LINE
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
06/22/2023 | Traffic Control set-up approved between 7AM - 5PM |
06/22/2023 | Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual. |
06/22/2023 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\ |
06/22/2023 | Proof of Notification is Required at the Time of Pre-Constuction Meeting |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0623-01847
Permite Description: 1 5X5 BELLHOLE ON CONCRETE/ASPHALT TO REPLACE GAS LINE
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/01/2023 | TRSP - ROW - Recurring | N/A | Complete (Recurring) |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0623-01847
Permit Description: 1 5X5 BELLHOLE ON CONCRETE/ASPHALT TO REPLACE GAS LINE
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/01/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
04/10/2024 | TRSP - ROW - Final/Close-Out | Passed | work completed no density tests or asphalt tickets provided | |
04/10/2024 | TRSP - ROW - Recurring | Passed | work completed no density tests or asphalt tickets provided. |