Permit: TR-UTL-0623-01841
Permit Details
Apply Date:
06/22/2023
Applicant:
Jaime Rivera
Description:
323004 Site 2 - Install Approximately 200 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and manhole bench rehabilitation will be completed on MH's 9593-09 and MH 9593-12 per PCRWRD standard detail 211
Permit Reviews
Permit Number - TR-UTL-0623-01841
Permit Status: Complete
Permit Description: 323004 Site 2 - Install Approximately 200 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and manhole bench rehabilitation will be completed on MH's 9593-09 and MH 9593-12 per PCRWRD standard detail 211
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/22/2023 | RIGHT-OF-WAY REVIEW v.1 | 07/03/2023 | APPROVED |
Conditions
Permit Number - TR-UTL-0623-01841
Permit Status: Complete
Permit Description: 323004 Site 2 - Install Approximately 200 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and manhole bench rehabilitation will be completed on MH's 9593-09 and MH 9593-12 per PCRWRD standard detail 211
Date | Description | Comments |
---|---|---|
06/26/2023 | Work Location | |
06/26/2023 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0623-01841
Permit Description: 323004 Site 2 - Install Approximately 200 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and manhole bench rehabilitation will be completed on MH's 9593-09 and MH 9593-12 per PCRWRD standard detail 211
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/04/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
11/24/2023 | TRSP - ROW - Final/Close-Out | Passed |