Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Apply Date:
06/22/2023
Applicant:
Jaime Rivera
Description:
323004 Site 2 - Install Approximately 200 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and manhole bench rehabilitation will be completed on MH's 9593-09 and MH 9593-12 per PCRWRD standard detail 211

Permit Reviews

Permit Number - TR-UTL-0623-01841
Permit Status: Complete
Permit Description: 323004 Site 2 - Install Approximately 200 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and manhole bench rehabilitation will be completed on MH's 9593-09 and MH 9593-12 per PCRWRD standard detail 211
Start Date Submittal Complete Date Status  
06/22/2023 RIGHT-OF-WAY REVIEW v.1 07/03/2023 APPROVED Review Details

Conditions

Permit Number - TR-UTL-0623-01841
Permit Status: Complete
Permit Description: 323004 Site 2 - Install Approximately 200 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and manhole bench rehabilitation will be completed on MH's 9593-09 and MH 9593-12 per PCRWRD standard detail 211
Date Description Comments
06/26/2023 Work Location
06/26/2023 Traffic control set-up approved between 9AM - 3:30PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0623-01841
Permit Description: 323004 Site 2 - Install Approximately 200 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collars and manhole bench rehabilitation will be completed on MH's 9593-09 and MH 9593-12 per PCRWRD standard detail 211
Total Completed Inspections - 2
Date Description Inspector Results Comments
10/04/2023 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
11/24/2023 TRSP - ROW - Final/Close-Out Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
323004 - SITE 2 FMP MAP (9245 E. CALLE DIEGO)_V1.PDF DOCUMENTS VIEW
DB 68006 - PAGE 2 - 9245 E CALLE DIEGO - TBC - BUMPOUT - 323004_V1.PDF DOCUMENTS VIEW