Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Apply Date:
06/06/2023
Applicant:
ANGEL MORALES
Description:
40’L X4’D X 3’W water line tie in will be done at night asphalt patch will be done daytime. Night HRS 9PM-5AM. New water line Tie-In for PIA T21PI00011 - Blackhawk Ranch I-2021-008.

Permit Reviews

Permit Number - TR-UTL-0623-01728
Permit Status: Complete
Permit Description: 40’L X4’D X 3’W water line tie in will be done at night asphalt patch will be done daytime. Night HRS 9PM-5AM. New water line Tie-In for PIA T21PI00011 - Blackhawk Ranch I-2021-008.
Start Date Submittal Complete Date Status  
06/06/2023 RIGHT-OF-WAY REVIEW v.1 06/07/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0623-01728
Permit Status: Complete
Permit Description: 40’L X4’D X 3’W water line tie in will be done at night asphalt patch will be done daytime. Night HRS 9PM-5AM. New water line Tie-In for PIA T21PI00011 - Blackhawk Ranch I-2021-008.
Total Outstanding Activity Conditions - 4
Date Name
06/07/2023 The following extended traffic control set-up times were approved:
06/07/2023 Traffic control set-up approved between 9AM - 3:30PM
06/07/2023 Pavement Patch Type Shall Be in Conformance to The Current Edition of The City of Tucson Public Utility Administrative Manual-
06/07/2023 PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-UTL-0623-01728
Permite Description: 40’L X4’D X 3’W water line tie in will be done at night asphalt patch will be done daytime. Night HRS 9PM-5AM. New water line Tie-In for PIA T21PI00011 - Blackhawk Ranch I-2021-008.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
07/03/2023 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting N/A Canceled

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0623-01728
Permit Description: 40’L X4’D X 3’W water line tie in will be done at night asphalt patch will be done daytime. Night HRS 9PM-5AM. New water line Tie-In for PIA T21PI00011 - Blackhawk Ranch I-2021-008.
Total Completed Inspections - 3
Date Description Inspector Results Comments
08/09/2023 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
09/25/2023 TRSP - ROW - Final/Close-Out Passed
09/25/2023 TRSP - ROW - Recurring Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
6317 E GARDEN STONE DR P1_V1.PDF DOCUMENTS VIEW
6317 E GARDEN STONE DR SITE_V1.PDF DOCUMENTS VIEW