Permit: TR-UTL-0526-00905
Permit Details
Status:
Fees Due
Type:
Right-of-Way (ROW) - Utility
Address:
1901 W CALLE DEL OCIO
Address NEW:
1901 W CALLE DEL OCIO
Apply Date:
05/29/2026
Applicant:
ANGEL MORALES
Description:
P.358388 OVERBUILD Bore 480' and trench 39' to place conduit and fiber cable Place 4038' of aerial fiber cable Place 3 handholes and 6 pedestals
Permit Reviews
Permit Number - TR-UTL-0526-00905
Permit Status: Fees due
Permit Description: P.358388 OVERBUILD
Bore 480' and trench 39' to place conduit and fiber cable
Place 4038' of aerial fiber cable
Place 3 handholes and 6 pedestals
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/01/2026 | RIGHT-OF-WAY REVIEW v.1 | 06/11/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0526-00905
Permit Status: Fees due
Permit Description: P.358388 OVERBUILD
Bore 480' and trench 39' to place conduit and fiber cable
Place 4038' of aerial fiber cable
Place 3 handholes and 6 pedestals
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 06/03/2026 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvement and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 06/03/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 06/03/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 06/03/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 06/03/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 06/11/2026 | Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley. |
| 06/11/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING |