Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
5142 E 24TH ST
Address NEW:
5142 E 24TH ST
Apply Date:
05/29/2026
Applicant:
Austin Eslick
Description:
T147198 - REPLACING (20) & REMOVING (3) TEP POLES. REPLACING (6) ANCHORS AND REMOVING (2) ANCHORS. REMOVE (6 SPANS 3 PHASE) OH PRIMARY CONDUCTORS AND OH ATTAHCMENTS, REPLACING (2) RISERS. POLE EXCAVATIONS 2'X2'. NO SIDEWALK IMPACT 09/02/26-renew permit for 30 days as of 09/06/26 new expiration date is 10/06/26. Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.

Permit Reviews

Permit Number - TR-UTL-0526-00903
Permit Status: Complete
Permit Description: T147198 - REPLACING (20) & REMOVING (3) TEP POLES. REPLACING (6) ANCHORS AND REMOVING (2) ANCHORS. REMOVE (6 SPANS 3 PHASE) OH PRIMARY CONDUCTORS AND OH ATTAHCMENTS, REPLACING (2) RISERS. POLE EXCAVATIONS 2'X2'. NO SIDEWALK IMPACT 09/02/26-renew permit for 30 days as of 09/06/26 new expiration date is 10/06/26. Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Start Date Submittal Complete Date Status  
05/29/2026 RIGHT-OF-WAY REVIEW v.1 06/05/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0526-00903
Permit Status: Complete
Permit Description: T147198 - REPLACING (20) & REMOVING (3) TEP POLES. REPLACING (6) ANCHORS AND REMOVING (2) ANCHORS. REMOVE (6 SPANS 3 PHASE) OH PRIMARY CONDUCTORS AND OH ATTAHCMENTS, REPLACING (2) RISERS. POLE EXCAVATIONS 2'X2'. NO SIDEWALK IMPACT 09/02/26-renew permit for 30 days as of 09/06/26 new expiration date is 10/06/26. Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Total Outstanding Activity Conditions - 3
Date Name
06/03/2026 **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14
06/03/2026 Traffic control set-up approved between 9AM - 3:30PM
06/04/2026 Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0526-00903
Permit Description: T147198 - REPLACING (20) & REMOVING (3) TEP POLES. REPLACING (6) ANCHORS AND REMOVING (2) ANCHORS. REMOVE (6 SPANS 3 PHASE) OH PRIMARY CONDUCTORS AND OH ATTAHCMENTS, REPLACING (2) RISERS. POLE EXCAVATIONS 2'X2'. NO SIDEWALK IMPACT 09/02/26-renew permit for 30 days as of 09/06/26 new expiration date is 10/06/26. Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Total Completed Inspections - 4
Date Description Inspector Results Comments
09/02/2026 TRSP - ROW - Barricade - Setup/Routine Passed alleyways are open with remaining work performed with shadow trucks
09/02/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed no pre-con meeting held, met with foreman Daniel on site. Job is ongoing with most pole removal and replacement completed, with line transfers remaining.
09/04/2026 TRSP - ROW - Final Passed all poles have been installed with powerlines transferred over, comm lines still remain on old poles. Traffic control devices have been removed with alleyways accessible, approved.
09/04/2026 TRSP - ROW - Backfill - Placement/Compaction Passed All poles have been installed

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
DB 72333 - 5133 E 24TH ST - VARIOUS - T147198_V1.PDF DOCUMENTS VIEW
T147198 - DPHH9 - AERIAL PERMIT_V1.PDF DOCUMENTS VIEW