Permit: TR-UTL-0526-00903
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
5142 E 24TH ST
Address NEW:
5142 E 24TH ST
Apply Date:
05/29/2026
Applicant:
Austin Eslick
Description:
T147198 - REPLACING (20) & REMOVING (3) TEP POLES. REPLACING (6) ANCHORS AND REMOVING (2) ANCHORS. REMOVE (6 SPANS 3 PHASE) OH PRIMARY CONDUCTORS AND OH ATTAHCMENTS, REPLACING (2) RISERS. POLE EXCAVATIONS 2'X2'. NO SIDEWALK IMPACT 09/02/26-renew permit for 30 days as of 09/06/26 new expiration date is 10/06/26. Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Permit Reviews
Permit Number - TR-UTL-0526-00903
Permit Status: Complete
Permit Description: T147198 - REPLACING (20) & REMOVING (3) TEP POLES. REPLACING (6) ANCHORS AND REMOVING (2) ANCHORS. REMOVE (6 SPANS 3 PHASE) OH PRIMARY CONDUCTORS AND OH ATTAHCMENTS, REPLACING (2) RISERS. POLE EXCAVATIONS 2'X2'. NO SIDEWALK IMPACT
09/02/26-renew permit for 30 days as of 09/06/26 new expiration date is 10/06/26.
Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits.
Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available.
If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/29/2026 | RIGHT-OF-WAY REVIEW v.1 | 06/05/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0526-00903
Permit Status: Complete
Permit Description: T147198 - REPLACING (20) & REMOVING (3) TEP POLES. REPLACING (6) ANCHORS AND REMOVING (2) ANCHORS. REMOVE (6 SPANS 3 PHASE) OH PRIMARY CONDUCTORS AND OH ATTAHCMENTS, REPLACING (2) RISERS. POLE EXCAVATIONS 2'X2'. NO SIDEWALK IMPACT
09/02/26-renew permit for 30 days as of 09/06/26 new expiration date is 10/06/26.
Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits.
Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available.
If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 06/03/2026 | **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 06/03/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 06/04/2026 | Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0526-00903
Permit Description: T147198 - REPLACING (20) & REMOVING (3) TEP POLES. REPLACING (6) ANCHORS AND REMOVING (2) ANCHORS. REMOVE (6 SPANS 3 PHASE) OH PRIMARY CONDUCTORS AND OH ATTAHCMENTS, REPLACING (2) RISERS. POLE EXCAVATIONS 2'X2'. NO SIDEWALK IMPACT
09/02/26-renew permit for 30 days as of 09/06/26 new expiration date is 10/06/26.
Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits.
Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available.
If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/02/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | alleyways are open with remaining work performed with shadow trucks | |
| 09/02/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | no pre-con meeting held, met with foreman Daniel on site. Job is ongoing with most pole removal and replacement completed, with line transfers remaining. | |
| 09/04/2026 | TRSP - ROW - Final | Passed | all poles have been installed with powerlines transferred over, comm lines still remain on old poles. Traffic control devices have been removed with alleyways accessible, approved. | |
| 09/04/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | All poles have been installed |