Permit: TR-UTL-0526-00902
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
4241 E POE ST
Address NEW:
4241 E POE ST
Apply Date:
05/29/2026
Applicant:
Austin Eslick
Description:
WO T182917 - Replacing Pole and Tranformer. Crew likely parking in road.
Permit Reviews
Permit Number - TR-UTL-0526-00902
Permit Status: Inspections
Permit Description: WO T182917 - Replacing Pole and Tranformer. Crew likely parking in road.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/10/2026 | RIGHT-OF-WAY REVIEW v.2 | 06/15/2026 | APPROVED |
| 05/29/2026 | RIGHT-OF-WAY REVIEW v.1 | 06/02/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0526-00902
Permit Status: Inspections
Permit Description: WO T182917 - Replacing Pole and Tranformer. Crew likely parking in road.
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 06/02/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 06/02/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 06/02/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 06/15/2026 | Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign. |
| 06/15/2026 | Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk |
| 06/15/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0526-00902
Permit Description: WO T182917 - Replacing Pole and Tranformer. Crew likely parking in road.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/07/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed |