Permit: TR-UTL-0526-00899
Permit Details
Status:
In Review
Type:
Right-of-Way (ROW) - Utility
Address:
2542 N FLOWING WELLS RD
Address NEW:
2542 N FLOWING WELLS RD
Apply Date:
05/28/2026
Applicant:
Marques Perez
Description:
Repaving and curb work for North and South driveways into 230kv Electric Substation, as well as (2) corresponding transmission pole foundation/installs as part of TEP project. Site Development Package: DP22-0178 Wall Package: TC-COM-0824-01528
Permit Reviews
Permit Number - TR-UTL-0526-00899
Permit Status: In review
Permit Description: Repaving and curb work for North and South driveways into 230kv Electric Substation, as well as (2) corresponding transmission pole foundation/installs as part of TEP project.
Site Development Package: DP22-0178 Wall Package: TC-COM-0824-01528
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/28/2026 | RIGHT-OF-WAY REVIEW v.1 | N/A | IN REVIEW |
Outstanding Activity Conditions
Permit Number - TR-UTL-0526-00899
Permit Status: In review
Permit Description: Repaving and curb work for North and South driveways into 230kv Electric Substation, as well as (2) corresponding transmission pole foundation/installs as part of TEP project.
Site Development Package: DP22-0178 Wall Package: TC-COM-0824-01528
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 06/02/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 06/02/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 06/02/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 06/02/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |