Permit: TR-UTL-0526-00892
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1545 S AVENIDA SIRIO
Address NEW:
1545 S AVENIDA SIRIO
Apply Date:
05/27/2026
Applicant:
Ben Lozano / Border Traffic Safety LLC
Description:
Replace broken fire hydrant and valve
Permit Reviews
Permit Number - TR-UTL-0526-00892
Permit Status: Complete
Permit Description: Replace broken fire hydrant and valve
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/15/2026 | RIGHT-OF-WAY REVIEW v.2 | 06/15/2026 | APPROVED |
| 05/27/2026 | RIGHT-OF-WAY REVIEW v.1 | 06/05/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0526-00892
Permit Status: Complete
Permit Description: Replace broken fire hydrant and valve
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 05/28/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 05/28/2026 | PAVEMENT MORATORIUM: ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |
| 05/28/2026 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 05/28/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0526-00892
Permite Description: Replace broken fire hydrant and valve
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/11/2026 | TRSP - ROW - SITE INSPECTION | N/A | Complete (Recurring) | Hydrant replacement in progress |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0526-00892
Permit Description: Replace broken fire hydrant and valve
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/23/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | sidewalk closed signs are in place | |
| 07/23/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | 6/11 phone call with Tricon and on site meeting with technician to review project | |
| 07/23/2026 | TRSP - ROW - SITE INSPECTION | Passed | Tricon has finished the hydrant and valve work and replaced the sidewalk panels, final closeout scheduled for tomorrow once barricades have been picked up and site has been cleaned up | |
| 07/23/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | sidewalk panels have been replaced, landscape around hydrant, backfilled, and compacted | |
| 07/24/2026 | TRSP - ROW - Final | Passed | site clear of devices and debris, flood area signs for wash still in place, approved |