Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
2401 S HOUGHTON RD
Apply Date:
05/27/2026
Applicant:
Esteban Vega - Desert Barricades
Description:
Continuation of work on permit # TR-UTL-1225-02053. WO T23050, T74431. TEP will be removing 5 poles along the East side of Houghton Road from Sahuaro Baptist Church driveway to TEP Spanish Trail Substation. (DTM - NIGHT WORK APPROVED ONLY for Lane Closures on Houghton Road- DTM 5/28/2026)

Permit Reviews

Permit Number - TR-UTL-0526-00891
Permit Status: Complete
Permit Description: Continuation of work on permit # TR-UTL-1225-02053. WO T23050, T74431. TEP will be removing 5 poles along the East side of Houghton Road from Sahuaro Baptist Church driveway to TEP Spanish Trail Substation. (DTM - NIGHT WORK APPROVED ONLY for Lane Closures on Houghton Road- DTM 5/28/2026)
Start Date Submittal Complete Date Status  
05/27/2026 RIGHT-OF-WAY REVIEW v.1 05/28/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0526-00891
Permit Status: Complete
Permit Description: Continuation of work on permit # TR-UTL-1225-02053. WO T23050, T74431. TEP will be removing 5 poles along the East side of Houghton Road from Sahuaro Baptist Church driveway to TEP Spanish Trail Substation. (DTM - NIGHT WORK APPROVED ONLY for Lane Closures on Houghton Road- DTM 5/28/2026)
Total Outstanding Activity Conditions - 6
Date Name
05/28/2026 The following extended traffic control set-up times were approved: Approved for Night Work ONLY 8pm to 5 am
05/28/2026 **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14
05/28/2026 Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk
05/28/2026 Traffic control set-up approved between 9AM - 3:30PM
05/28/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
05/28/2026 Approved Temporary Noise Exemption required prior to Night work being performed within the City of Tucson Right of Way..

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0526-00891
Permit Description: Continuation of work on permit # TR-UTL-1225-02053. WO T23050, T74431. TEP will be removing 5 poles along the East side of Houghton Road from Sahuaro Baptist Church driveway to TEP Spanish Trail Substation. (DTM - NIGHT WORK APPROVED ONLY for Lane Closures on Houghton Road- DTM 5/28/2026)
Total Completed Inspections - 4
Date Description Inspector Results Comments
08/14/2026 TRSP - ROW - Barricade - Setup/Routine Passed all barricades removed from site
08/14/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed covered pre activity inspection on previous permit
08/14/2026 TRSP - ROW - Backfill - Placement/Compaction Passed New poles are in place, shoulder landscape area is completely backfilled
08/14/2026 TRSP - ROW - Final Passed all pole installation has been completed, traffic control devices removed from site, approved

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
DB 71815 - 2401 S HOUGHTON RD - SHOULDER CLOSURE - T23050_V1_V1.PDF DOCUMENTS VIEW
REMOVAL PERMIT AND TCP MAP HOUGHTON PI 22ND TO IRV._V1.PDF DOCUMENTS VIEW
REVISED TCP DB 71815 -PAGE 2 - 2401 S HOUGHTON RD - NB MIDBLOCK - T23050_V1.PDF DOCUMENTS VIEW