Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
7101 E 19TH ST
Address NEW:
7101 E 19TH ST
Apply Date:
05/27/2026
Applicant:
Ben Lozano / Border Traffic Safety LLC
Description:
Fire Hydrant realignment and System abandonment (DTM - 7/7/26 - Per conversation with Tricon Work is active, became emergency closure)

Permit Reviews

Permit Number - TR-UTL-0526-00888
Permit Status: Complete
Permit Description: Fire Hydrant realignment and System abandonment (DTM - 7/7/26 - Per conversation with Tricon Work is active, became emergency closure)
Start Date Submittal Complete Date Status  
05/27/2026 RIGHT-OF-WAY REVIEW v.1 06/04/2026 REQUIRES RESUBMIT Review Details
07/07/2026 RIGHT-OF-WAY REVIEW v.3 07/07/2026 APPROVED Review Details
06/22/2026 RIGHT-OF-WAY REVIEW v.2 06/24/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0526-00888
Permit Status: Complete
Permit Description: Fire Hydrant realignment and System abandonment (DTM - 7/7/26 - Per conversation with Tricon Work is active, became emergency closure)
Total Outstanding Activity Conditions - 5
Date Name
05/28/2026 Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
05/28/2026 PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14
05/28/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
07/07/2026 The following extended traffic control set-up times were approved: 6am to 3:30 pm
07/07/2026 Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-UTL-0526-00888
Permite Description: Fire Hydrant realignment and System abandonment (DTM - 7/7/26 - Per conversation with Tricon Work is active, became emergency closure)
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
07/09/2026 TRSP - ROW - Barricade - Setup/Routine N/A Partial Pass

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0526-00888
Permit Description: Fire Hydrant realignment and System abandonment (DTM - 7/7/26 - Per conversation with Tricon Work is active, became emergency closure)
Total Completed Inspections - 4
Date Description Inspector Results Comments
07/08/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
07/13/2026 TRSP - ROW - Backfill - Placement/Compaction Passed
07/31/2026 TRSP - ROW - Barricade - Setup/Routine Passed
07/31/2026 TRSP - ROW - Final Passed

Documents

File Name Document Type  
7101 E 19TH ST-1R-MODEL_V3.PDF DOCUMENTS VIEW
7101 E. 19TH ST DRAWING_V1.PDF DOCUMENTS VIEW
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW