Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
6262 E TIMROD ST
Address NEW:
6262 E TIMROD ST
Apply Date:
05/27/2026
Applicant:
Ben Lozano / Border Traffic Safety LLC
Description:
Replace broken fire hydrant

Permit Reviews

Permit Number - TR-UTL-0526-00886
Permit Status: Complete
Permit Description: Replace broken fire hydrant
Start Date Submittal Complete Date Status  
05/27/2026 RIGHT-OF-WAY REVIEW v.1 06/04/2026 REQUIRES RESUBMIT Review Details
06/09/2026 RIGHT-OF-WAY REVIEW v.2 06/10/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0526-00886
Permit Status: Complete
Permit Description: Replace broken fire hydrant
Total Outstanding Activity Conditions - 9
Date Name
05/28/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION WITH jose.garcia@tucsonaz.gov.. Due to the presence of a bus stop in the area, the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 48 business hours before beginning work to coordinate impacts.
05/28/2026 Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
05/28/2026 PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14
05/28/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
06/10/2026 Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign.
06/10/2026 The following extended traffic control set-up times were approved: NIGHT WORK - 9pm - 5am
06/10/2026 A permit shall expire for work not started within thirty (30) days or completed within sixty (60) days after issuance of a permit, and a new permit shall be required before beginning or completing the work. (Ord. No. 2657, § 1, 10-19-64)
06/10/2026 Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety
06/10/2026 Approved Temporary Noise Exemption required prior to Night work being performed within the City of Tucson Right of Way..

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-UTL-0526-00886
Permite Description: Replace broken fire hydrant
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
07/01/2026 TRSP - ROW - Barricade - Setup/Routine N/A Deferred

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0526-00886
Permit Description: Replace broken fire hydrant
Total Completed Inspections - 3
Date Description Inspector Results Comments
06/29/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
07/01/2026 TRSP - ROW - Backfill - Placement/Compaction Passed
07/01/2026 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
6262 E TIMROD ST DRAWING_V1.PDF DOCUMENTS VIEW
6262 E TIMROD ST-1-MODEL REV1_V1 - STAMPED ZS.PDF DOCUMENTS VIEW
6262 E TIMROD ST-1-MODEL REV1_V1.PDF DOCUMENTS VIEW