Permit: TR-UTL-0526-00881
Permit Details
Status:
Needs Resubmittal
Type:
Right-of-Way (ROW) - Utility
Address:
4451 S 12TH AV
Address NEW:
4451 S 12TH AV
Apply Date:
05/26/2026
Applicant:
Description:
wo3159866 4451 s 12th av 14 13 36 nw replace hydrant front of prop in dirt shoulder and road - dirt/asphalt 6LF/sc
Permit Reviews
Permit Number - TR-UTL-0526-00881
Permit Status: Needs resubmittal
Permit Description: wo3159866 4451 s 12th av 14 13 36 nw replace hydrant front of prop in dirt shoulder and road - dirt/asphalt 6LF/sc
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/27/2026 | RIGHT-OF-WAY REVIEW v.1 | 05/27/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0526-00881
Permit Status: Needs resubmittal
Permit Description: wo3159866 4451 s 12th av 14 13 36 nw replace hydrant front of prop in dirt shoulder and road - dirt/asphalt 6LF/sc
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 05/27/2026 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION WITH jose.garcia@tucsonaz.gov.. Due to the presence of a bus stop in the area, the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 48 business hours before beginning work to coordinate impacts. |
| 05/27/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 05/27/2026 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 05/27/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 05/27/2026 | Traffic control set-up approved between 9AM - 3:30PM |