Permit: TR-UTL-0526-00875
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
2802 N ALVERNON WY
Address NEW:
2802 N ALVERNON WY
Apply Date:
05/26/2026
Applicant:
Kristine Schwartz
Description:
SWG Crews will need to cycle gas valves, no excavation will occur. Crews will need to lift lid and cycle valve for routine maintenance.
Permit Reviews
Permit Number - TR-UTL-0526-00875
Permit Status: Complete
Permit Description: SWG Crews will need to cycle gas valves, no excavation will occur. Crews will need to lift lid and cycle valve for routine maintenance.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/26/2026 | RIGHT-OF-WAY REVIEW v.1 | 05/27/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0526-00875
Permit Status: Complete
Permit Description: SWG Crews will need to cycle gas valves, no excavation will occur. Crews will need to lift lid and cycle valve for routine maintenance.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 05/26/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 05/27/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 05/27/2026 | shadow traffic control closures not to exceed 1 hrs in a single location, with on site flaggers for right of way with less than 2 travel lanes in each direction. Closure to exceed 1 hrs will require full traffic control setups based on road configuration |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0526-00875
Permit Description: SWG Crews will need to cycle gas valves, no excavation will occur. Crews will need to lift lid and cycle valve for routine maintenance.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/01/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 07/01/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 07/01/2026 | TRSP - ROW - Final | Passed |