Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3468 S 9TH AV
Address NEW:
3468 S 9TH AV
Apply Date:
05/23/2026
Applicant:
luis granillo
Description:
wo3264888 3468 s 9th av 14 13 25 sw install new service eastside of lot in asphalt 20LF/sc

Permit Reviews

Permit Number - TR-UTL-0526-00873
Permit Status: Complete
Permit Description: wo3264888 3468 s 9th av 14 13 25 sw install new service eastside of lot in asphalt 20LF/sc
Start Date Submittal Complete Date Status  
05/25/2026 RIGHT-OF-WAY REVIEW v.1 N/A APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0526-00873
Permit Status: Complete
Permit Description: wo3264888 3468 s 9th av 14 13 25 sw install new service eastside of lot in asphalt 20LF/sc
Total Outstanding Activity Conditions - 4
Date Name
05/26/2026 Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced.
05/26/2026 Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
05/26/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
05/26/2026 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0526-00873
Permit Description: wo3264888 3468 s 9th av 14 13 25 sw install new service eastside of lot in asphalt 20LF/sc
Total Completed Inspections - 4
Date Description Inspector Results Comments
08/03/2026 TRSP - ROW - Barricade - Setup/Routine Passed
08/03/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
08/03/2026 TRSP - ROW - Backfill - Placement/Compaction Passed
08/03/2026 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW