Permit: TR-UTL-0526-00870
Permit Details
Status:
Fees Due
Type:
Right-of-Way (ROW) - Utility
Address:
4144 N ORACLE RD
Address NEW:
4144 N ORACLE RD
Apply Date:
05/22/2026
Applicant:
Adrien Pineda
Description:
ARIZONA PIPELINE WILL NEED TO EXCAVATE (1)50'X2' TRENCH IN THE ASPHALT ROW IN ORDER TO REPLACE THE GAS SERVICE FOR 4144 N ORACLE RD
Permit Reviews
Permit Number - TR-UTL-0526-00870
Permit Status: Fees due
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE (1)50'X2' TRENCH IN THE ASPHALT ROW IN ORDER TO REPLACE THE GAS SERVICE FOR 4144 N ORACLE RD
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/22/2026 | RIGHT-OF-WAY REVIEW v.1 | 05/27/2026 | REQUIRES RESUBMIT |
| 06/16/2026 | RIGHT-OF-WAY REVIEW v.2 | 06/23/2026 | REQUIRES RESUBMIT |
| 07/06/2026 | RIGHT-OF-WAY REVIEW v.3 | 07/06/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0526-00870
Permit Status: Fees due
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE (1)50'X2' TRENCH IN THE ASPHALT ROW IN ORDER TO REPLACE THE GAS SERVICE FOR 4144 N ORACLE RD
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 05/26/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 07/06/2026 | City of Tucson Right of Way Only ROW Permit is only allowed for work within City of Tucson Right of Way. |
| 07/06/2026 | Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety |
| 07/06/2026 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 07/06/2026 | Sec. 25-5. Permit expiration. A permit shall expire for work not started within thirty (30) days or completed within sixty (60) days after issuance of a permit, and a new permit shall be required before beginning or completing the work. (Ord. No. 2657, ยง 1, 10-19-64) |
| 07/06/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |