Permit Details

Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Address NEW:
8650 E COLETTE ST
Apply Date:
05/20/2026
Applicant:
James Maki
Description:
Tie into water main and run new waterline to well site.

Permit Reviews

Permit Number - TR-UTL-0526-00862
Permit Status: Issued
Permit Description: Tie into water main and run new waterline to well site.
Start Date Submittal Complete Date Status  
05/21/2026 RIGHT-OF-WAY REVIEW v.1 05/27/2026 REQUIRES RESUBMIT Review Details
06/01/2026 RIGHT-OF-WAY REVIEW v.2 06/05/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0526-00862
Permit Status: Issued
Permit Description: Tie into water main and run new waterline to well site.
Total Outstanding Activity Conditions - 7
Date Name
05/26/2026 **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14
05/26/2026 Traffic control set-up approved between 9AM - 3:30PM
06/05/2026 Coordination - The contractor shall coordinate all construction activities and traffic control with other active projects and traffic control operations in the area. Traffic control shall be adjusted as necessary to avoid conflicts and maintain safe traffic flow.
06/05/2026 Excavation - All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety
06/05/2026 Pavement Restoration - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period
06/05/2026 Pedestrian Access – Continuous ADA-compliant pedestrian access shall be maintained at all times. If sidewalks are closed, an approved temporary pedestrian access route shall be provided in accordance with the Manual on Uniform Traffic Control Devices.
06/05/2026 Traffic Control Devices - Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk.

Documents

File Name Document Type  
CONS-1-PRJ000404 EQUIP WELL D-048B CONST PLANS-SEALED 20250905_V1_RED_V1.PDF DOCUMENTS VIEW