Permit: TR-UTL-0526-00853
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
4340 S PASEO MELODIOSO
Address NEW:
4340 S PASEO MELODIOSO
Apply Date:
05/20/2026
Applicant:
Tucson Electric Power
Description:
WOs T175193 & T141923. Replacing transformer.
Permit Reviews
Permit Number - TR-UTL-0526-00853
Permit Status: Complete
Permit Description: WOs T175193 & T141923. Replacing transformer.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/26/2026 | RIGHT-OF-WAY REVIEW v.2 | 05/27/2026 | APPROVED |
| 05/20/2026 | RIGHT-OF-WAY REVIEW v.1 | 05/21/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0526-00853
Permit Status: Complete
Permit Description: WOs T175193 & T141923. Replacing transformer.
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 05/20/2026 | Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety |
| 05/20/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 05/27/2026 | A permit shall expire for work not started within thirty (30) days or completed within sixty (60) days after issuance of a permit, and a new permit shall be required before beginning or completing the work. (Ord. No. 2657, § 1, 10-19-64 |
| 05/27/2026 | City of Tucson Right of Way Only ROW Permit is only allowed for work within City of Tucson Right of Way. |
| 05/27/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 05/27/2026 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0526-00853
Permit Description: WOs T175193 & T141923. Replacing transformer.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/02/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | flaggers for single travel lane in place, one day set up for transformer completion | |
| 06/02/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | phone call with Ramey, job is mobilizing today. On-site contact is Taylor, will inspect the flagging set up and verify job duration. | |
| 06/25/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | landscape area backfilled and compacted, approved | |
| 06/25/2026 | TRSP - ROW - Final | Passed | all landscape area work completed, devices and debris removed from site, approved |