Permit: TR-UTL-0526-00847
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
4410 S PARK AV
Address NEW:
4410 S PARK AV
Apply Date:
05/19/2026
Applicant:
Esteban Vega - Desert Barricades
Description:
WO T172367 - TEP WILL BE WORKING IN ROW TO PULL CONDUCTOR, SET TRANSFORMER AND SET METER FOR THIS CITY PROJECT. ALL CIVIL GROUNDWORK WAS COMPLETED BY THE CITY CONTRACTOR ON THIS PROJECT.
Permit Reviews
Permit Number - TR-UTL-0526-00847
Permit Status: Inspections
Permit Description: WO T172367 - TEP WILL BE WORKING IN ROW TO PULL CONDUCTOR, SET TRANSFORMER AND SET METER FOR THIS CITY PROJECT. ALL CIVIL GROUNDWORK WAS COMPLETED BY THE CITY CONTRACTOR ON THIS PROJECT.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/19/2026 | RIGHT-OF-WAY REVIEW v.1 | 05/28/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0526-00847
Permit Status: Inspections
Permit Description: WO T172367 - TEP WILL BE WORKING IN ROW TO PULL CONDUCTOR, SET TRANSFORMER AND SET METER FOR THIS CITY PROJECT. ALL CIVIL GROUNDWORK WAS COMPLETED BY THE CITY CONTRACTOR ON THIS PROJECT.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 05/20/2026 | **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 05/20/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 05/28/2026 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION WITH jose.garcia@tucsonaz.gov.. Due to the presence of a bus stop in the area, the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 48 business hours before beginning work to coordinate impacts. |
| 05/28/2026 | Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0526-00847
Permit Description: WO T172367 - TEP WILL BE WORKING IN ROW TO PULL CONDUCTOR, SET TRANSFORMER AND SET METER FOR THIS CITY PROJECT. ALL CIVIL GROUNDWORK WAS COMPLETED BY THE CITY CONTRACTOR ON THIS PROJECT.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/03/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed |