Permit: TR-UTL-0526-00844
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
9024 E 21ST ST
Address NEW:
9024 E 21ST ST
Apply Date:
05/18/2026
Applicant:
Esteban Vega - Desert Barricades
Description:
WO T175378. TEP will remove 1 pole. Dig a 2’X2’ hole 6’ deep with no sidewalk impact.
Permit Reviews
Permit Number - TR-UTL-0526-00844
Permit Status: Complete
Permit Description: WO T175378. TEP will remove 1 pole. Dig a 2’X2’ hole 6’ deep with no sidewalk impact.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/19/2026 | RIGHT-OF-WAY REVIEW v.1 | 05/19/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0526-00844
Permit Status: Complete
Permit Description: WO T175378. TEP will remove 1 pole. Dig a 2’X2’ hole 6’ deep with no sidewalk impact.
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 05/19/2026 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION WITH jose.garcia@tucsonaz.gov.. Due to the presence of a bus stop in the area, the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 48 business hours before beginning work to coordinate impacts. |
| 05/19/2026 | Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk |
| 05/19/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING |
| 05/19/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 05/19/2026 | Sec. 25-5. Permit expiration. A permit shall expire for work not started within thirty (30) days or completed within sixty (60) days after issuance of a permit, and a new permit shall be required before beginning or completing the work. (Ord. No. 2657, § 1, 10-19-64) |
| 05/19/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 05/19/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0526-00844
Permit Description: WO T175378. TEP will remove 1 pole. Dig a 2’X2’ hole 6’ deep with no sidewalk impact.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/17/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 07/17/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 07/17/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 07/17/2026 | TRSP - ROW - Final | Passed |