Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
5859 E 35TH ST
Address NEW:
5859 E 35TH ST
Apply Date:
05/18/2026
Applicant:
Ben Lozano / Border Traffic Safety LLC
Description:
Maryvale Manor Phase 6 Water Main Replacement- approx 4895 LF of Main Replacement with new services on 35th St, 36th St, and Jefferson Ave 09/28/26- renew permit for 30 days as of 09/30/26 new expiration date 10/30/26. Before 07/01/26 Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.

Permit Reviews

Permit Number - TR-UTL-0526-00842
Permit Status: Inspections
Permit Description: Maryvale Manor Phase 6 Water Main Replacement- approx 4895 LF of Main Replacement with new services on 35th St, 36th St, and Jefferson Ave 09/28/26- renew permit for 30 days as of 09/30/26 new expiration date 10/30/26. Before 07/01/26 Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Start Date Submittal Complete Date Status  
06/04/2026 RIGHT-OF-WAY REVIEW v.2 06/15/2026 REQUIRES RESUBMIT Review Details
05/18/2026 RIGHT-OF-WAY REVIEW v.1 06/01/2026 REQUIRES RESUBMIT Review Details
06/23/2026 RIGHT-OF-WAY REVIEW v.3 06/30/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0526-00842
Permit Status: Inspections
Permit Description: Maryvale Manor Phase 6 Water Main Replacement- approx 4895 LF of Main Replacement with new services on 35th St, 36th St, and Jefferson Ave 09/28/26- renew permit for 30 days as of 09/30/26 new expiration date 10/30/26. Before 07/01/26 Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Total Outstanding Activity Conditions - 3
Date Name
05/22/2026 Traffic Control set-up approved between 7AM - 5PM
05/22/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
05/22/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0526-00842
Permite Description: Maryvale Manor Phase 6 Water Main Replacement- approx 4895 LF of Main Replacement with new services on 35th St, 36th St, and Jefferson Ave 09/28/26- renew permit for 30 days as of 09/30/26 new expiration date 10/30/26. Before 07/01/26 Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
09/30/2026 TRSP - ROW - Barricade - Setup/Routine N/A Complete (Recurring) road closures, advanced warnings, and illuminated barricades in place
09/30/2026 TRSP - ROW - Backfill - Placement/Compaction N/A Complete (Recurring) waterline main has rough backfill to grade, awaiting private water service tie ins. Permit is currently set to expire today, 30 day extension request has been submitted by Tricon.
09/30/2026 TRSP - ROW - Final N/A Not Ready Work is still ongoing, with 30 day extension request submitted. Timeline estimates currently project work will go beyond 30 days and a new permit to continue will be issued.

Completed Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0526-00842
Permit Description: Maryvale Manor Phase 6 Water Main Replacement- approx 4895 LF of Main Replacement with new services on 35th St, 36th St, and Jefferson Ave 09/28/26- renew permit for 30 days as of 09/30/26 new expiration date 10/30/26. Before 07/01/26 Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Total Completed Inspections - 1
Date Description Inspector Results Comments
09/30/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed pre-con meeting held on 5/19 with Mike Bravin, Tucson water, and Tricon.

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
MARYVALE MANOR PH 6-5-MODEL_V2.PDF DOCUMENTS VIEW
MARYVALE MANOR PH 6-3-MODEL_V1.PDF DOCUMENTS VIEW
TW-PLAN-0326-0045_PJW791-MARYVALE MR_FINAL_V2.PDF DOCUMENTS VIEW
MARYVALE MANOR PH 6-1-MODEL_V1.PDF DOCUMENTS VIEW
MARYVALE MANOR PH 6-2-MODEL_V1.PDF DOCUMENTS VIEW