Permit: TR-UTL-0526-00842
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
5859 E 35TH ST
Address NEW:
5859 E 35TH ST
Apply Date:
05/18/2026
Applicant:
Ben Lozano / Border Traffic Safety LLC
Description:
Maryvale Manor Phase 6 Water Main Replacement- approx 4895 LF of Main Replacement with new services on 35th St, 36th St, and Jefferson Ave 09/28/26- renew permit for 30 days as of 09/30/26 new expiration date 10/30/26. Before 07/01/26 Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Permit Reviews
Permit Number - TR-UTL-0526-00842
Permit Status: Inspections
Permit Description: Maryvale Manor Phase 6 Water Main Replacement- approx 4895 LF of Main Replacement with new services on 35th St, 36th St, and Jefferson Ave
09/28/26- renew permit for 30 days as of 09/30/26 new expiration date 10/30/26.
Before 07/01/26
Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits.
Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available.
If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/04/2026 | RIGHT-OF-WAY REVIEW v.2 | 06/15/2026 | REQUIRES RESUBMIT |
| 05/18/2026 | RIGHT-OF-WAY REVIEW v.1 | 06/01/2026 | REQUIRES RESUBMIT |
| 06/23/2026 | RIGHT-OF-WAY REVIEW v.3 | 06/30/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0526-00842
Permit Status: Inspections
Permit Description: Maryvale Manor Phase 6 Water Main Replacement- approx 4895 LF of Main Replacement with new services on 35th St, 36th St, and Jefferson Ave
09/28/26- renew permit for 30 days as of 09/30/26 new expiration date 10/30/26.
Before 07/01/26
Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits.
Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available.
If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 05/22/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 05/22/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 05/22/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0526-00842
Permite Description: Maryvale Manor Phase 6 Water Main Replacement- approx 4895 LF of Main Replacement with new services on 35th St, 36th St, and Jefferson Ave
09/28/26- renew permit for 30 days as of 09/30/26 new expiration date 10/30/26.
Before 07/01/26
Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits.
Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available.
If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/30/2026 | TRSP - ROW - Barricade - Setup/Routine | N/A | Complete (Recurring) | road closures, advanced warnings, and illuminated barricades in place |
| 09/30/2026 | TRSP - ROW - Backfill - Placement/Compaction | N/A | Complete (Recurring) | waterline main has rough backfill to grade, awaiting private water service tie ins. Permit is currently set to expire today, 30 day extension request has been submitted by Tricon. |
| 09/30/2026 | TRSP - ROW - Final | N/A | Not Ready | Work is still ongoing, with 30 day extension request submitted. Timeline estimates currently project work will go beyond 30 days and a new permit to continue will be issued. |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0526-00842
Permit Description: Maryvale Manor Phase 6 Water Main Replacement- approx 4895 LF of Main Replacement with new services on 35th St, 36th St, and Jefferson Ave
09/28/26- renew permit for 30 days as of 09/30/26 new expiration date 10/30/26.
Before 07/01/26
Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits.
Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available.
If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/30/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | pre-con meeting held on 5/19 with Mike Bravin, Tucson water, and Tricon. |