Permit: TR-UTL-0526-00822
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
431 N CAMINO SANTIAGO
Address NEW:
431 N CAMINO SANTIAGO
Apply Date:
05/12/2026
Applicant:
Ilana Galluzzo
Description:
- NEW BUSINESS - APPROX 75FT WITHIN CAMINO SANTIAGO ROW. 60FT IN ASPHALT FOR TIE IN. - 1 - 5X5FT BELLHOLE AT TIE IN 06/23/26- Received a revised Traffic Control Plan (TCP) and revision narrative indicating a change in the scope of work along Camino Santiago. The revision states that the tie-in point for the gas service is being relocated.
Permit Reviews
Permit Number - TR-UTL-0526-00822
Permit Status: Complete
Permit Description: - NEW BUSINESS - APPROX 75FT WITHIN CAMINO SANTIAGO ROW. 60FT IN ASPHALT FOR TIE IN.
- 1 - 5X5FT BELLHOLE AT TIE IN
06/23/26- Received a revised Traffic Control Plan (TCP) and revision narrative indicating a change in the scope of work along Camino Santiago. The revision states that the tie-in point for the gas service is being relocated.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/22/2026 | RIGHT-OF-WAY REVIEW REVISION v.1 | 06/26/2026 | APPROVED |
| 05/13/2026 | RIGHT-OF-WAY REVIEW v.1 | 05/18/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0526-00822
Permit Status: Complete
Permit Description: - NEW BUSINESS - APPROX 75FT WITHIN CAMINO SANTIAGO ROW. 60FT IN ASPHALT FOR TIE IN.
- 1 - 5X5FT BELLHOLE AT TIE IN
06/23/26- Received a revised Traffic Control Plan (TCP) and revision narrative indicating a change in the scope of work along Camino Santiago. The revision states that the tie-in point for the gas service is being relocated.
Total Outstanding Activity Conditions - 8
| Date | Name |
|---|---|
| 05/14/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 05/14/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 05/18/2026 | - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety |
| 05/18/2026 | Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk |
| 05/18/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 05/18/2026 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 05/18/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 05/18/2026 | Sec. 25-5. Permit expiration. A permit shall expire for work not started within thirty (30) days or completed within sixty (60) days after issuance of a permit, and a new permit shall be required before beginning or completing the work. (Ord. No. 2657, ยง 1, 10-19-64) |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0526-00822
Permit Description: - NEW BUSINESS - APPROX 75FT WITHIN CAMINO SANTIAGO ROW. 60FT IN ASPHALT FOR TIE IN.
- 1 - 5X5FT BELLHOLE AT TIE IN
06/23/26- Received a revised Traffic Control Plan (TCP) and revision narrative indicating a change in the scope of work along Camino Santiago. The revision states that the tie-in point for the gas service is being relocated.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/26/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Southwest gas project complete the loop for the new neighborhood development | |
| 08/20/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | work completed on this a month ago closing permit | |
| 08/20/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | complete a couple of months ago closing permit | |
| 08/20/2026 | TRSP - ROW - Final | Passed | See photos, they changed the running line on this to put all the work in this area in the dirt for the new installation of the new gas line going into the new development |