Permit: TR-UTL-0526-00820
Permit Details
Status:
Fees Due
Type:
Right-of-Way (ROW) - Utility
Address:
4555 E 10TH ST
Address NEW:
4555 E 10TH ST
Apply Date:
05/12/2026
Applicant:
ANGEL MORALES
Description:
P.355277A OVERBUILD BORE 4065' AND TRENCH 134' TO PLACE CONDUIT AND FIBER CABLE PLACE 53' OF AERIAL FIBER CABLE PULL 718' OF FIBER CABLE THROUGH EXISTING CONDUIT PLACE 5 HAND HOLES
Permit Reviews
Permit Number - TR-UTL-0526-00820
Permit Status: Fees due
Permit Description: P.355277A OVERBUILD
BORE 4065' AND TRENCH 134' TO PLACE CONDUIT AND FIBER CABLE
PLACE 53' OF AERIAL FIBER CABLE
PULL 718' OF FIBER CABLE THROUGH EXISTING CONDUIT
PLACE 5 HAND HOLES
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/13/2026 | RIGHT-OF-WAY REVIEW v.1 | 06/01/2026 | REQUIRES RESUBMIT |
| 06/15/2026 | RIGHT-OF-WAY REVIEW v.2 | 06/15/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0526-00820
Permit Status: Fees due
Permit Description: P.355277A OVERBUILD
BORE 4065' AND TRENCH 134' TO PLACE CONDUIT AND FIBER CABLE
PLACE 53' OF AERIAL FIBER CABLE
PULL 718' OF FIBER CABLE THROUGH EXISTING CONDUIT
PLACE 5 HAND HOLES
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 05/19/2026 | **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 05/19/2026 | Bus stop in the area, contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 at least 48-business hours prior to start of work for coordination. |
| 05/19/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 06/01/2026 | City of Tucson Right of Way Only |