Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
10240 E LONE CACTUS TR
Apply Date:
05/11/2026
Applicant:
Cox Communications
Description:
PRJ315607-1 Cox to pull through 614' for CATV system tie

Permit Reviews

Permit Number - TR-UTL-0526-00815
Permit Status: Complete
Permit Description: PRJ315607-1 Cox to pull through 614' for CATV system tie
Start Date Submittal Complete Date Status  
05/11/2026 RIGHT-OF-WAY REVIEW v.1 05/19/2026 REQUIRES RESUBMIT Review Details
05/28/2026 RIGHT-OF-WAY REVIEW v.2 06/01/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0526-00815
Permit Status: Complete
Permit Description: PRJ315607-1 Cox to pull through 614' for CATV system tie
Total Outstanding Activity Conditions - 6
Date Name
05/14/2026 **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14
05/14/2026 Traffic control set-up approved between 9AM - 3:30PM
05/14/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
06/01/2026 City of Tucson Right of Way Only ROW Permit is only allowed for work within City of Tucson Right of Way.
06/01/2026 Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk
06/01/2026 Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0526-00815
Permit Description: PRJ315607-1 Cox to pull through 614' for CATV system tie
Total Completed Inspections - 4
Date Description Inspector Results Comments
06/17/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed onsite walkthrough with Jim, notification flyers and 811 ticket needed. Planning on pulling through existing conduit, boring will only be needed if issue arises
08/28/2026 TRSP - ROW - Barricade - Setup/Routine Passed all traffic control devices have been removed from site
08/28/2026 TRSP - ROW - Backfill - Placement/Compaction Passed New cable was pulled through existing conduit and connected to existing pedestals, all work in landscape areas restored
08/28/2026 TRSP - ROW - Final Passed Cable has been pulled through existing conduit with all landscape backfill for potholes and pedestals completed, traffic control devices have been removed from site, approved

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
PRJ315607-1 TUCSON_V1.PDF DOCUMENTS VIEW
TCP REV. 10240 E LONE CACTUS TRAIL_V1.PDF DOCUMENTS VIEW