Permit Details

Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Address NEW:
1510 S MARMORA AV
Apply Date:
05/11/2026
Applicant:
Cox Communications
Description:
PRJ315152-1 - Cox to trench 4' and bore 306' to install new CATV conduit for service repair order

Permit Reviews

Permit Number - TR-UTL-0526-00801
Permit Status: Issued
Permit Description: PRJ315152-1 - Cox to trench 4' and bore 306' to install new CATV conduit for service repair order
Start Date Submittal Complete Date Status  
05/11/2026 RIGHT-OF-WAY REVIEW v.1 05/14/2026 REQUIRES RESUBMIT Review Details
06/01/2026 RIGHT-OF-WAY REVIEW v.2 06/01/2026 VOID Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0526-00801
Permit Status: Issued
Permit Description: PRJ315152-1 - Cox to trench 4' and bore 306' to install new CATV conduit for service repair order
Total Outstanding Activity Conditions - 5
Date Name
05/13/2026 **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14
05/13/2026 Traffic Control set-up approved between 7AM - 5PM
05/14/2026 Excavation - All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety
05/14/2026 S Marmora Av is subject to a pavement moratorium. A 2-inch mill and overlay, covering one-half the width of the roadway, shall be required. The required pavement restoration treatment shall be confirmed by the ROW Inspector at the preconstruction meeting.
05/14/2026 The contractor shall not block driveways or restrict resident access without prior notification and shall coordinate directly with affected property owners as necessary

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
PRJ315152-1 - TCP 1510 S MARMORA AVE_V1.PDF DOCUMENTS VIEW
PRJ315152-1 - TUCSON_V1.PDF DOCUMENTS VIEW