Permit: TR-UTL-0526-00800
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
5525 S MISSION RD BLDG 1
Address NEW:
5525 S MISSION RD BLDG 1
Apply Date:
05/11/2026
Applicant:
Brittany West
Description:
starting phase 2 at the end of phase 1. Hang 2,825ft of new strand and new 144ct fiber.this is part 2 of phase 2. hang 2,415ft of new strand and 144ct fiber.
Permit Reviews
Permit Number - TR-UTL-0526-00800
Permit Status: Complete
Permit Description: starting phase 2 at the end of phase 1. Hang 2,825ft of new strand and new 144ct fiber.this is part 2 of phase 2. hang 2,415ft of new strand and 144ct fiber.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/11/2026 | RIGHT-OF-WAY REVIEW v.1 | 06/11/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0526-00800
Permit Status: Complete
Permit Description: starting phase 2 at the end of phase 1. Hang 2,825ft of new strand and new 144ct fiber.this is part 2 of phase 2. hang 2,415ft of new strand and 144ct fiber.
Total Outstanding Activity Conditions - 8
| Date | Name |
|---|---|
| 05/22/2026 | This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to the Historic Preservation Office, City of Tucson, PO BOX 27210, Tucson AZ 85726...***Please contact Historic Preservation Office at PDSDHistoric@tucsonaz.gov. |
| 05/22/2026 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 05/22/2026 | ROW Permit is only allowed for work within City of Tucson Right of Way. |
| 05/22/2026 | Approved for Work within City of Tucson Right of Way Only. Pima Couty permits will be required for work in and Traffic Control within Pima ROW |
| 05/22/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 05/22/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 05/22/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 06/03/2026 | Flaggers shall remain on sidewalk only. Flaggers shall not be placed on arterial or collector streets such as Irvington Rd and Mission. Police point control required when crossing Irvington. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0526-00800
Permit Description: starting phase 2 at the end of phase 1. Hang 2,825ft of new strand and new 144ct fiber.this is part 2 of phase 2. hang 2,415ft of new strand and 144ct fiber.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/21/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 07/21/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 07/21/2026 | TRSP - ROW - AERIAL INSTALLATION | Passed | ||
| 07/21/2026 | TRSP - ROW - Final | Passed |