Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
3268 E 25TH ST
Address NEW:
3268 E 25TH ST
Apply Date:
05/08/2026
Applicant:
Tucson Electric Power
Description:
WO T157943 - Replacing 4 Poles, Installing OH Transformer Request for 30 Day Renewal as of 08/23/2026 Permit Renewal Notice Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.

Permit Reviews

Permit Number - TR-UTL-0526-00796
Permit Status: Inspections
Permit Description: WO T157943 - Replacing 4 Poles, Installing OH Transformer Request for 30 Day Renewal as of 08/23/2026 Permit Renewal Notice Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Start Date Submittal Complete Date Status  
05/08/2026 RIGHT-OF-WAY REVIEW v.1 N/A APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0526-00796
Permit Status: Inspections
Permit Description: WO T157943 - Replacing 4 Poles, Installing OH Transformer Request for 30 Day Renewal as of 08/23/2026 Permit Renewal Notice Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Total Outstanding Activity Conditions - 5
Date Name
05/11/2026 Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
05/11/2026 PAVEMENT MORATORIUM: ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.
05/11/2026 PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14
05/11/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
05/11/2026 Traffic Control set-up approved between 7AM - 5PM

Outstanding Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0526-00796
Permite Description: WO T157943 - Replacing 4 Poles, Installing OH Transformer Request for 30 Day Renewal as of 08/23/2026 Permit Renewal Notice Effective July 1, 2026, the Mayor and Council approved and implemented a new fee structure and updated application requirements for right-of-way permits. Permits issued prior to July 1, 2026, under the previous fee structure, are eligible for one final renewal for a maximum of 30 days. The previous 60- and 90-day renewal options are no longer available. If work extends beyond the 30-day renewal period, a new permit application must be submitted. The new application must comply with the current fee structure and include all required project information, including the actual number of days traffic control and/or lane closures will be in place (not the permit duration) and the length × width (L × W) of all pavement cuts.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
08/14/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting N/A Not Ready phone call with Rudy, awaiting bluestake and work crew assignment. Proactivity meeting will be held closer to mobilization.

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW