Permit Details

Status:
On Hold
Type:
Right-of-Way (ROW) - Utility
Apply Date:
05/08/2026
Applicant:
ANGEL MORALES
Description:
P.349869B OVERBUILD BORE 71' AND TRENCH 13' TO PLACE CONDUIT AND FIBER CABLE PLACE 1254' OF AERIAL FIBER CABLE

Permit Reviews

Permit Number - TR-UTL-0526-00795
Permit Status: On hold
Permit Description: P.349869B OVERBUILD BORE 71' AND TRENCH 13' TO PLACE CONDUIT AND FIBER CABLE PLACE 1254' OF AERIAL FIBER CABLE
Start Date Submittal Complete Date Status  
06/30/2026 RIGHT-OF-WAY REVIEW v.3 07/06/2026 APPROVED Review Details
06/17/2026 RIGHT-OF-WAY REVIEW v.2 06/26/2026 REQUIRES RESUBMIT Review Details
05/08/2026 RIGHT-OF-WAY REVIEW v.1 06/03/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0526-00795
Permit Status: On hold
Permit Description: P.349869B OVERBUILD BORE 71' AND TRENCH 13' TO PLACE CONDUIT AND FIBER CABLE PLACE 1254' OF AERIAL FIBER CABLE
Total Outstanding Activity Conditions - 11
Date Name
05/15/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
05/15/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION
05/15/2026 Traffic control set-up approved between 9AM - 3:30PM
05/15/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
05/15/2026 Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvement and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced.
05/15/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
07/02/2026 Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less โ€“ Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less โ€“ greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More โ€“ Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign.
07/02/2026 Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk
07/02/2026 No pedestrian detour is proposed; therefore, the sidewalk shall remain open and ADA-compliant at all times during construction. Worker-assisted pedestrian access does not constitute a pedestrian detour and shall not require pedestrians to leave the designated pedestrian path. If the sidewalk cannot be maintained in an open and ADA-compliant condition, an approved pedestrian detour shall be implemented prior to any sidewalk closure.
07/02/2026 Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14
07/02/2026 Sec. 25-5. Permit expiration. A permit shall expire for work not started within thirty (30) days or completed within sixty (60) days after issuance of a permit, and a new permit shall be required before beginning or completing the work. (Ord. No. 2657, ยง 1, 10-19-64)

Documents

File Name Document Type  
P.349869 B TCPS 6.29.26_V1.PDF DOCUMENTS VIEW
P.349869B - TUCSON - PERMIT DESIGN 5-4-26_V1.PDF DOCUMENTS VIEW
P.349869B AERIAL SITE MAP_V1.PDF DOCUMENTS VIEW