Permit: TR-UTL-0526-00794
Permit Details
Status:
Fees Due
Type:
Right-of-Way (ROW) - Utility
Address:
5771 E 12TH ST
Address NEW:
5771 E 12TH ST
Apply Date:
05/08/2026
Applicant:
ANGEL MORALES
Description:
P.349869A OVERBUILD BORE 2182' AND TRENCH 65' TO PLACE CONDUIT AND FIBER CABLE PLACE 7 PEDESTALS PLACE 2006' OF AERIAL FIBER CABLE
Permit Reviews
Permit Number - TR-UTL-0526-00794
Permit Status: Fees due
Permit Description: P.349869A OVERBUILD
BORE 2182' AND TRENCH 65' TO PLACE CONDUIT AND FIBER CABLE
PLACE 7 PEDESTALS
PLACE 2006' OF AERIAL FIBER CABLE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/26/2026 | RIGHT-OF-WAY REVIEW v.1 | 06/29/2026 | APPROVED |
| 05/08/2026 | RIGHT-OF-WAY REVIEW v.1 | 05/14/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0526-00794
Permit Status: Fees due
Permit Description: P.349869A OVERBUILD
BORE 2182' AND TRENCH 65' TO PLACE CONDUIT AND FIBER CABLE
PLACE 7 PEDESTALS
PLACE 2006' OF AERIAL FIBER CABLE
Total Outstanding Activity Conditions - 9
| Date | Name |
|---|---|
| 05/11/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 06/29/2026 | Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign. |
| 06/29/2026 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION WITH jose.garcia@tucsonaz.gov..the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 48 business hours before beginning work to coordinate impacts. |
| 06/29/2026 | Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley. |
| 06/29/2026 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
| 06/29/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 06/29/2026 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 06/29/2026 | Sec. 25-5. Permit expiration. A permit shall expire for work not started within thirty (30) days or completed within sixty (60) days after issuance of a permit, and a new permit shall be required before beginning or completing the work. (Ord. No. 2657, § 1, 10-19-64) |
| 06/29/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |