Permit: TR-UTL-0526-00792
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1901 W CALLE DEL OCIO
Address NEW:
1901 W CALLE DEL OCIO
Apply Date:
05/07/2026
Applicant:
Ilana Galluzzo
Description:
ENCLAVES AT TUMAMOC - NEW BUSINESS, 132FT OF 2" PE INSTALLED VIA OPEN TRENCH. WITH 5X5FT BELLHOLE AT TIE IN WITHIN ALLEY.
Permit Reviews
Permit Number - TR-UTL-0526-00792
Permit Status: Complete
Permit Description: ENCLAVES AT TUMAMOC - NEW BUSINESS, 132FT OF 2" PE INSTALLED VIA OPEN TRENCH. WITH 5X5FT BELLHOLE AT TIE IN WITHIN ALLEY.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/07/2026 | RIGHT-OF-WAY REVIEW v.1 | 05/14/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0526-00792
Permit Status: Complete
Permit Description: ENCLAVES AT TUMAMOC - NEW BUSINESS, 132FT OF 2" PE INSTALLED VIA OPEN TRENCH. WITH 5X5FT BELLHOLE AT TIE IN WITHIN ALLEY.
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 05/11/2026 | **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 05/11/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 05/11/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 05/14/2026 | Excavation - All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety |
| 05/14/2026 | Neighborhood work - The contractor shall not block driveways or restrict resident access without prior notification and shall coordinate directly with affected property owners as necessary |
| 05/14/2026 | Pavement Restoration - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0526-00792
Permit Description: ENCLAVES AT TUMAMOC - NEW BUSINESS, 132FT OF 2" PE INSTALLED VIA OPEN TRENCH. WITH 5X5FT BELLHOLE AT TIE IN WITHIN ALLEY.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/26/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Southwest gas project complete the loop for the new neighborhood development | |
| 08/20/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | They gotta finish the restoration in the alleyway. They will have it done before Labor Day. | |
| 08/20/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | They gotta finish the restoration in the alleyway. They will have it done before Labor Day. | |
| 08/27/2026 | TRSP - ROW - Final | Passed | All work has been completed on the southwest gas crossing asphalt restoration and striping has been completed |