Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
5827 E 33RD ST
Address NEW:
5827 E 33RD ST
Apply Date:
05/06/2026
Applicant:
ANGEL MORALES
Description:
wo#3283130 827 E 33rd St 14-14-19 sw new service install at the rear nw corner of the lot in dirt area 6lf/ar

Permit Reviews

Permit Number - TR-UTL-0526-00788
Permit Status: Complete
Permit Description: wo#3283130 827 E 33rd St 14-14-19 sw new service install at the rear nw corner of the lot in dirt area 6lf/ar
Start Date Submittal Complete Date Status  
05/07/2026 RIGHT-OF-WAY REVIEW v.1 N/A APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0526-00788
Permit Status: Complete
Permit Description: wo#3283130 827 E 33rd St 14-14-19 sw new service install at the rear nw corner of the lot in dirt area 6lf/ar
Total Outstanding Activity Conditions - 4
Date Name
05/11/2026 Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced.
05/11/2026 Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
05/11/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
05/11/2026 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0526-00788
Permit Description: wo#3283130 827 E 33rd St 14-14-19 sw new service install at the rear nw corner of the lot in dirt area 6lf/ar
Total Completed Inspections - 4
Date Description Inspector Results Comments
06/23/2026 TRSP - ROW - Barricade - Setup/Routine Passed devices removed from site, all work completed
06/23/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed phone call with Sylvia, confirmed work has been completed
06/23/2026 TRSP - ROW - Backfill - Placement/Compaction Passed landscape area in alleyway restored, job completed
06/23/2026 TRSP - ROW - Final Passed alleyway restored, devices removed, all work completed

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW