Permit: TR-UTL-0526-00788
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
5827 E 33RD ST
Address NEW:
5827 E 33RD ST
Apply Date:
05/06/2026
Applicant:
ANGEL MORALES
Description:
wo#3283130 827 E 33rd St 14-14-19 sw new service install at the rear nw corner of the lot in dirt area 6lf/ar
Permit Reviews
Permit Number - TR-UTL-0526-00788
Permit Status: Complete
Permit Description: wo#3283130 827 E 33rd St 14-14-19 sw new service install at the rear nw corner of the lot in dirt area 6lf/ar
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/07/2026 | RIGHT-OF-WAY REVIEW v.1 | N/A | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0526-00788
Permit Status: Complete
Permit Description: wo#3283130 827 E 33rd St 14-14-19 sw new service install at the rear nw corner of the lot in dirt area 6lf/ar
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 05/11/2026 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 05/11/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 05/11/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 05/11/2026 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0526-00788
Permit Description: wo#3283130 827 E 33rd St 14-14-19 sw new service install at the rear nw corner of the lot in dirt area 6lf/ar
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/23/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | devices removed from site, all work completed | |
| 06/23/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | phone call with Sylvia, confirmed work has been completed | |
| 06/23/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | landscape area in alleyway restored, job completed | |
| 06/23/2026 | TRSP - ROW - Final | Passed | alleyway restored, devices removed, all work completed |