Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Apply Date:
05/05/2026
Applicant:
Rene Villalobos
Description:
wo#3287479 2489 n silver mosaic dr 1313 33 se service repair - front of lot in asphalt 6LF/sc

Permit Reviews

Permit Number - TR-UTL-0526-00771
Permit Status: Issued
Permit Description: wo#3287479 2489 n silver mosaic dr 1313 33 se service repair - front of lot in asphalt 6LF/sc
Start Date Submittal Complete Date Status  
05/05/2026 RIGHT-OF-WAY REVIEW v.1 N/A APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0526-00771
Permit Status: Issued
Permit Description: wo#3287479 2489 n silver mosaic dr 1313 33 se service repair - front of lot in asphalt 6LF/sc
Total Outstanding Activity Conditions - 4
Date Name
05/07/2026 Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
05/07/2026 PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14
05/07/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
05/07/2026 Traffic Control set-up approved between 7AM - 5PM

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW