Permit: TR-UTL-0526-00767
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3405 N ROMERO RD
Address NEW:
3405 N ROMERO RD
Apply Date:
05/05/2026
Applicant:
Esteban Vega - Desert Barricades
Description:
T177558 - TEP remove 1 pole from ROW with no sidewalk impact. Dig a 2’X2’ 6’deep hole.
Permit Reviews
Permit Number - TR-UTL-0526-00767
Permit Status: Complete
Permit Description: T177558 - TEP remove 1 pole from ROW with no sidewalk impact. Dig a 2’X2’ 6’deep hole.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/19/2026 | RIGHT-OF-WAY REVIEW v.2 | 05/27/2026 | APPROVED |
| 05/05/2026 | RIGHT-OF-WAY REVIEW v.1 | 05/11/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0526-00767
Permit Status: Complete
Permit Description: T177558 - TEP remove 1 pole from ROW with no sidewalk impact. Dig a 2’X2’ 6’deep hole.
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 05/05/2026 | This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Historic Preservation Office at PDSDHistoric@tucsonaz.gov. |
| 05/05/2026 | **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 05/05/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 05/27/2026 | Excavation - All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety |
| 05/27/2026 | Pedestrian Access – Continuous ADA-compliant pedestrian access shall be maintained at all times. If sidewalks are closed, an approved temporary pedestrian access route shall be provided in accordance with the Manual on Uniform Traffic Control Devices. |
| 05/27/2026 | Traffic Control Devices - Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk. |
| 05/27/2026 | Utility Equipment in the ROW - Equipment or poles shall not be stored unattended within the ROW without approved barricades and safety delineation. Equipment or Poles left overnight or for extended periods must be properly secured and protected to prevent hazards to pedestrians, bicyclists, and vehicles. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0526-00767
Permit Description: T177558 - TEP remove 1 pole from ROW with no sidewalk impact. Dig a 2’X2’ 6’deep hole.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/20/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | TEP pole removal | |
| 07/27/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 07/27/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 07/27/2026 | TRSP - ROW - Final | Passed | Backfill has been completed for pole, replacement and pole removal. See photos. |