Permit Details

Status:
Fees Due
Type:
Right-of-Way (ROW) - Utility
Address:
4502 N 1ST AV
Address NEW:
4502 N 1ST AV
Apply Date:
05/04/2026
Applicant:
ANGEL MORALES
Description:
P.348374 OVERBUILD BORE 398' AND TRENCH 10' TO PLACE CONDUIT AND FIBER CABLE PLACE 1 HAND HOLE

Permit Reviews

Permit Number - TR-UTL-0526-00763
Permit Status: Fees due
Permit Description: P.348374 OVERBUILD BORE 398' AND TRENCH 10' TO PLACE CONDUIT AND FIBER CABLE PLACE 1 HAND HOLE
Start Date Submittal Complete Date Status  
05/04/2026 RIGHT-OF-WAY REVIEW v.1 05/28/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0526-00763
Permit Status: Fees due
Permit Description: P.348374 OVERBUILD BORE 398' AND TRENCH 10' TO PLACE CONDUIT AND FIBER CABLE PLACE 1 HAND HOLE
Total Outstanding Activity Conditions - 8
Date Name
05/06/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
05/06/2026 Traffic control set-up approved between 9AM - 3:30PM
05/06/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
05/06/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
05/06/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
05/28/2026 Excavation - All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety
05/28/2026 Pavement Restoration - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period
05/28/2026 Pedestrian Access – Continuous ADA-compliant pedestrian access shall be maintained at all times. If sidewalks are closed, an approved temporary pedestrian access route shall be provided in accordance with the Manual on Uniform Traffic Control Devices.

Documents

File Name Document Type  
P.348374 - TUSCON - 5-4-26_V1.PDF DOCUMENTS VIEW
P.348374 SITE MAP_V1.PDF DOCUMENTS VIEW
PAULEY CONSTRUCTION- 4502 N 1ST AV - RIGHT LN CLS PLAN 1 - P.348374_V1.PDF DOCUMENTS VIEW