Permit: TR-UTL-0525-00849
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
6639 S 12TH AV
Address NEW:
6639 S 12TH AV
Apply Date:
05/27/2025
Applicant:
Ben Lozano / Border Traffic Safety LLC
Description:
Installing 6" Fire protection service, 1" & 2" water services with meters (07/02/2025)- Renew 30 days as of 07/03/2025. New expiration date is 08/02/2025
Permit Reviews
Permit Number - TR-UTL-0525-00849
Permit Status: Inspections
Permit Description: Installing 6" Fire protection service, 1" & 2" water services with meters
(07/02/2025)- Renew 30 days as of 07/03/2025. New expiration date is 08/02/2025
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/28/2025 | RIGHT-OF-WAY REVIEW v.1 | 05/30/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0525-00849
Permit Status: Inspections
Permit Description: Installing 6" Fire protection service, 1" & 2" water services with meters
(07/02/2025)- Renew 30 days as of 07/03/2025. New expiration date is 08/02/2025
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 05/28/2025 | PAVEMENT MORATORIUM |
| 05/28/2025 | PRE-CON/PAVEMENT/SIDEWALK |
| 05/28/2025 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0525-00849
Permite Description: Installing 6" Fire protection service, 1" & 2" water services with meters
(07/02/2025)- Renew 30 days as of 07/03/2025. New expiration date is 08/02/2025
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/21/2025 | TRSP - ROW - Final | N/A | Partial Pass |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0525-00849
Permit Description: Installing 6" Fire protection service, 1" & 2" water services with meters
(07/02/2025)- Renew 30 days as of 07/03/2025. New expiration date is 08/02/2025
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/14/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 06/30/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 07/14/2025 | TRSP - ROW - Barricade Takedown | Passed | ||
| 07/21/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed |