Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1566 S BROWN AV
Address NEW:
1566 S BROWN AV
Apply Date:
05/23/2025
Applicant:
Cox Communications
Description:
PRJ295263-4 In alley behind 1566 S Brown Ave, remove and replace pedestal for 14x20x34" pedestal. Tie in. n alley behind 1569 S Brown Ave, remove and replace pedestal for 14x20x34" pedestal. Tie in

Permit Reviews

Permit Number - TR-UTL-0525-00838
Permit Status: Complete
Permit Description: PRJ295263-4 In alley behind 1566 S Brown Ave, remove and replace pedestal for 14x20x34" pedestal. Tie in. n alley behind 1569 S Brown Ave, remove and replace pedestal for 14x20x34" pedestal. Tie in
Start Date Submittal Complete Date Status  
05/23/2025 RIGHT-OF-WAY REVIEW v.1 05/23/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0525-00838
Permit Status: Complete
Permit Description: PRJ295263-4 In alley behind 1566 S Brown Ave, remove and replace pedestal for 14x20x34" pedestal. Tie in. n alley behind 1569 S Brown Ave, remove and replace pedestal for 14x20x34" pedestal. Tie in
Total Outstanding Activity Conditions - 2
Date Name
05/23/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
05/23/2025 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0525-00838
Permit Description: PRJ295263-4 In alley behind 1566 S Brown Ave, remove and replace pedestal for 14x20x34" pedestal. Tie in. n alley behind 1569 S Brown Ave, remove and replace pedestal for 14x20x34" pedestal. Tie in
Total Completed Inspections - 4
Date Description Inspector Results Comments
06/26/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed I spoke with Francisco over the phone and he told me that Tuesday 7-1-25 would be a estimated start date for the pedestal replacements
07/03/2025 TRSP - ROW - Barricade - Setup/Routine Passed Work is complete. Traffic control has been removed.
07/03/2025 TRSP - ROW - Backfill - Placement/Compaction Passed Work is complete
07/09/2025 TRSP - ROW - Final Passed Work is complete

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
NS-501251_PRJ295263-4_1569 S BROWN AVE_TCP_V1.PDF DOCUMENTS VIEW
PRJ295263-4 SKETCH_V1.PDF DOCUMENTS VIEW