Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
6565 E GRANT RD
Address NEW:
6565 E GRANT RD
Apply Date:
05/23/2025
Applicant:
Cox Communications
Description:
PRJ293932-1 cox to bore 14' to install new conduit for system tie.

Permit Reviews

Permit Number - TR-UTL-0525-00837
Permit Status: Complete
Permit Description: PRJ293932-1 cox to bore 14' to install new conduit for system tie.
Start Date Submittal Complete Date Status  
05/28/2025 RIGHT-OF-WAY REVIEW v.2 05/30/2025 REQUIRES RESUBMIT Review Details
05/23/2025 RIGHT-OF-WAY REVIEW v.1 05/27/2025 REQUIRES RESUBMIT Review Details
06/02/2025 RIGHT-OF-WAY REVIEW v.3 06/02/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0525-00837
Permit Status: Complete
Permit Description: PRJ293932-1 cox to bore 14' to install new conduit for system tie.
Total Outstanding Activity Conditions - 5
Date Name
05/23/2025 BUS STOP IN AREA, CONTACT SUN TRAN DISPTCH AT 520.206.8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
05/23/2025 Traffic control set-up approved between 9AM - 3:30PM
06/02/2025 PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS IF LOCATED WITHIN 660' OF CLOSURE. PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO ADA RAMPS ACCESSABLE. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2.
06/02/2025 Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
06/02/2025 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0525-00837
Permit Description: PRJ293932-1 cox to bore 14' to install new conduit for system tie.
Total Completed Inspections - 3
Date Description Inspector Results Comments
06/16/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
07/01/2025 TRSP - ROW - Barricade - Setup/Routine Passed
07/03/2025 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
PRJ293932-1_V1.PDF DOCUMENTS VIEW
TCP REV BI-618074_PRJ293932-1_6565 E GRANT RD_V3.PDF DOCUMENTS VIEW