Permit: TR-UTL-0525-00824
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1063 E ADAMS ST
Address NEW:
1063 E ADAMS ST
Apply Date:
05/21/2025
Applicant:
Rene Villalobos
Description:
1063 e Adams st 14-14-06 nw, work order 3021117, renew 2" main on the east side of the lot in asphalt and dirt, 5lf, ca (07/01/2025)-Renew 60days as of 06/29/2025, New expiration date is 08/28/2025
Permit Reviews
Permit Number - TR-UTL-0525-00824
Permit Status: Complete
Permit Description: 1063 e Adams st 14-14-06 nw, work order 3021117, renew 2" main on the east side of the lot in asphalt and dirt, 5lf, ca
(07/01/2025)-Renew 60days as of 06/29/2025, New expiration date is 08/28/2025
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/22/2025 | RIGHT-OF-WAY REVIEW v.1 | 05/28/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0525-00824
Permit Status: Complete
Permit Description: 1063 e Adams st 14-14-06 nw, work order 3021117, renew 2" main on the east side of the lot in asphalt and dirt, 5lf, ca
(07/01/2025)-Renew 60days as of 06/29/2025, New expiration date is 08/28/2025
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 05/23/2025 | Traffic Control set-up approved between 7AM - 5PM |
| 05/28/2025 | LOCAL - E Adams St is subject to a pavement moratorium. A 2-inch mill and overlay, covering half the width of the roadway, is required. The ROW inspector will confirm the treatment required for pavement restoration at the preconstruction meeting |
| 05/28/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0525-00824
Permit Description: 1063 e Adams st 14-14-06 nw, work order 3021117, renew 2" main on the east side of the lot in asphalt and dirt, 5lf, ca
(07/01/2025)-Renew 60days as of 06/29/2025, New expiration date is 08/28/2025
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/25/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 08/25/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 08/25/2025 | TRSP - ROW - Final | Passed |