Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
120 W BLACKLIDGE DR
Apply Date:
05/21/2025
Applicant:
Rene Villalobos
Description:
120 w Blacklidge dr 13-13-36 nw, work order 3026683, install new service at the front of the lot in asphalt, 5lf. ca

Permit Reviews

Permit Number - TR-UTL-0525-00823
Permit Status: Complete
Permit Description: 120 w Blacklidge dr 13-13-36 nw, work order 3026683, install new service at the front of the lot in asphalt, 5lf. ca
Start Date Submittal Complete Date Status  
05/22/2025 RIGHT-OF-WAY REVIEW v.1 05/23/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0525-00823
Permit Status: Complete
Permit Description: 120 w Blacklidge dr 13-13-36 nw, work order 3026683, install new service at the front of the lot in asphalt, 5lf. ca
Total Outstanding Activity Conditions - 1
Date Name
05/23/2025 Traffic Control set-up approved between 7AM - 5PM

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-UTL-0525-00823
Permite Description: 120 w Blacklidge dr 13-13-36 nw, work order 3026683, install new service at the front of the lot in asphalt, 5lf. ca
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
06/30/2025 TRSP - ROW - Barricade - Setup/Routine N/A Re-inspection required
06/30/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting N/A Re-inspection required
06/30/2025 TRSP - ROW - Backfill - Placement/Compaction N/A Re-inspection required
06/30/2025 TRSP - ROW - Final N/A Re-inspection required

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0525-00823
Permit Description: 120 w Blacklidge dr 13-13-36 nw, work order 3026683, install new service at the front of the lot in asphalt, 5lf. ca
Total Completed Inspections - 4
Date Description Inspector Results Comments
04/27/2026 TRSP - ROW - Barricade - Setup/Routine Passed Yes all work completed they did a slurry coat to complete the patch
04/27/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
04/27/2026 TRSP - ROW - Backfill - Placement/Compaction Passed
04/27/2026 TRSP - ROW - Final Passed Yes all work completed they did a slurry coat to complete the patch

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW