Permit: TR-UTL-0525-00823
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
120 W BLACKLIDGE DR
Address NEW:
120 W BLACKLIDGE DR
Apply Date:
05/21/2025
Applicant:
Rene Villalobos
Description:
120 w Blacklidge dr 13-13-36 nw, work order 3026683, install new service at the front of the lot in asphalt, 5lf. ca
Permit Reviews
Permit Number - TR-UTL-0525-00823
Permit Status: Complete
Permit Description: 120 w Blacklidge dr 13-13-36 nw, work order 3026683, install new service at the front of the lot in asphalt, 5lf. ca
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/22/2025 | RIGHT-OF-WAY REVIEW v.1 | 05/23/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0525-00823
Permit Status: Complete
Permit Description: 120 w Blacklidge dr 13-13-36 nw, work order 3026683, install new service at the front of the lot in asphalt, 5lf. ca
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 05/23/2025 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0525-00823
Permite Description: 120 w Blacklidge dr 13-13-36 nw, work order 3026683, install new service at the front of the lot in asphalt, 5lf. ca
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/30/2025 | TRSP - ROW - Barricade - Setup/Routine | N/A | Re-inspection required | |
| 06/30/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | N/A | Re-inspection required | |
| 06/30/2025 | TRSP - ROW - Backfill - Placement/Compaction | N/A | Re-inspection required | |
| 06/30/2025 | TRSP - ROW - Final | N/A | Re-inspection required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0525-00823
Permit Description: 120 w Blacklidge dr 13-13-36 nw, work order 3026683, install new service at the front of the lot in asphalt, 5lf. ca
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/27/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | Yes all work completed they did a slurry coat to complete the patch | |
| 04/27/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 04/27/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 04/27/2026 | TRSP - ROW - Final | Passed | Yes all work completed they did a slurry coat to complete the patch |