Permit: TR-UTL-0525-00800
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
5702 E COOPER ST
Address NEW:
5702 E COOPER ST
Apply Date:
05/19/2025
Applicant:
Sylvia Cranz
Description:
5702 e cooper st 14-13-14 nw, work order 3046095, renew leaking service in the alley on the southside of the lot in dirt, 6lf. ca
Permit Reviews
Permit Number - TR-UTL-0525-00800
Permit Status: Complete
Permit Description: 5702 e cooper st 14-13-14 nw, work order 3046095, renew leaking service in the alley on the southside of the lot in dirt, 6lf. ca
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/19/2025 | RIGHT-OF-WAY REVIEW v.1 | 05/19/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0525-00800
Permit Status: Complete
Permit Description: 5702 e cooper st 14-13-14 nw, work order 3046095, renew leaking service in the alley on the southside of the lot in dirt, 6lf. ca
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 05/19/2025 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 05/19/2025 | Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley. |
| 05/19/2025 | EMERGENCY AFTER THE FACT PERMIT – A TCP was not provided due to the nature of the work. Any legal questions related to this work shall be directed to Contractor to address because DTM did not have an opportunity to review, approve, or inspect the work. |
| 05/19/2025 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0525-00800
Permit Description: 5702 e cooper st 14-13-14 nw, work order 3046095, renew leaking service in the alley on the southside of the lot in dirt, 6lf. ca
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/23/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 06/23/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 06/23/2025 | TRSP - ROW - Final | Passed |