Permit: TR-UTL-0525-00792
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
5455 E SPEEDWAY BL
Address NEW:
5455 E SPEEDWAY BL
Apply Date:
05/16/2025
Applicant:
Cox Communications
Description:
Cox to overlash 480ft, 48ct fiber
Permit Reviews
Permit Number - TR-UTL-0525-00792
Permit Status: Complete
Permit Description: Cox to overlash 480ft, 48ct fiber
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/16/2025 | RIGHT-OF-WAY REVIEW v.1 | 05/19/2025 | APPROVED |
| 06/25/2025 | RIGHT-OF-WAY REVIEW REVISION v.1 | 06/25/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0525-00792
Permit Status: Complete
Permit Description: Cox to overlash 480ft, 48ct fiber
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 05/16/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 05/16/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 05/19/2025 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS IF LOCATED WITHIN 660' OF CLOSURE. PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO ADA RAMPS ACCESSABLE. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. |
| 05/19/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING |
| 05/19/2025 | Vertical Message Boards to be placed 5 days in advance of Crossing. Boards to Read: Date,Time, activity. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0525-00792
Permit Description: Cox to overlash 480ft, 48ct fiber
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/04/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 08/14/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 08/20/2025 | TRSP - ROW - Final | Passed |