Permit: TR-UTL-0525-00783
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
2334 E 2ND ST
Address NEW:
2334 E 2ND ST
Apply Date:
05/15/2025
Applicant:
DAVID MARQUEZ
Description:
2334 E 2nd st 14-14-08-nw, work order 3022168, replace galvanized line on north side, asphalt and concrete, 6lf.ca
Permit Reviews
Permit Number - TR-UTL-0525-00783
Permit Status: Complete
Permit Description: 2334 E 2nd st 14-14-08-nw, work order 3022168, replace galvanized line on north side, asphalt and concrete, 6lf.ca
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/15/2025 | RIGHT-OF-WAY REVIEW v.1 | 05/16/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0525-00783
Permit Status: Complete
Permit Description: 2334 E 2nd st 14-14-08-nw, work order 3022168, replace galvanized line on north side, asphalt and concrete, 6lf.ca
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 05/15/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 05/15/2025 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0525-00783
Permite Description: 2334 E 2nd st 14-14-08-nw, work order 3022168, replace galvanized line on north side, asphalt and concrete, 6lf.ca
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/17/2025 | TRSP - ROW - Final | N/A | Re-inspection required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0525-00783
Permit Description: 2334 E 2nd st 14-14-08-nw, work order 3022168, replace galvanized line on north side, asphalt and concrete, 6lf.ca
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/17/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 06/17/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 06/17/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 08/19/2025 | TRSP - ROW - Final | Passed |